Data / Environmental compliance / Electric Power Generation, Transmission and Distribution / California
NAICS 2211 in California: 94 facilities
Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).
EPA's ECHO database lists 94 facilities in Electric Power Generation, Transmission and Distribution (NAICS 2211) in California with a formal enforcement action, penalties of $5,000 or more, three or more quarters in significant noncompliance or a federal case in the five years to November 1, 2026: 356 formal actions, 278 informal actions and $6,319,628 in penalties.
The request: Get every facility in Electric Power Generation, Transmission and Distribution in California with penalties and violations. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- Industry
- NAICS 2211, Electric Power Generation, Transmission and Distribution
- State
- California
- Facilities
- 94
- Formal enforcement actions
- 356
- Informal actions
- 278
- Penalties
- $6,319,628 ($1,425,255 from federal cases)
- Facilities with three or more quarters in significant noncompliance
- 51
Facilities with the largest penalties
Ranked by penalties of the last five years. Each row links to EPA's facility report.
| Facility | City | State | Formal actions | Penalties | Quarters in significant noncompliance | Latest penalty | Source |
|---|
| Martinez Refining | Martinez | CA | 2 | $2,335,970 | 12 | December 9, 2024 | echo.epa.gov |
| Tesoro Los Angeles Refinery and Calciner | Carson | CA | 1 | $503,288 | 1 | October 28, 2024 | echo.epa.gov |
| Castaic | Castaic | CA | 2 | $249,000 | 9 | March 5, 2025 | echo.epa.gov |
| Oakland Power Plant | Oakland | CA | 3 | $238,500 | 12 | February 2, 2023 | echo.epa.gov |
| Mariposa Energy, LLC | Livermore | CA | 13 | $209,000 | 12 | December 19, 2024 | echo.epa.gov |
| Republic Services, Keller Canyon Landfill | Pittsburg | CA | 22 | $167,750 | 12 | January 28, 2025 | echo.epa.gov |
| Elk Hills Power Plant | Tupman | CA | 9 | $139,500 | 0 | April 10, 2023 | echo.epa.gov |
| Midway Peaking LLC | Firebaugh | CA | 8 | $135,200 | 0 | November 6, 2023 | echo.epa.gov |
| El Centro Generating Station | El Centro | CA | 4 | $118,110 | 5 | July 25, 2025 | echo.epa.gov |
| Reworld Stanislaus County Resource Recovery Facilty, Landfill | Crows Landing | CA | 13 | $116,665 | 12 | June 15, 2023 | echo.epa.gov |
| MT. Poso Cogeneration Facility | Bakersfield | CA | 5 | $100,000 | 12 | February 29, 2024 | echo.epa.gov |
| Woodland Generation Station | Modesto | CA | 17 | $75,244 | 4 | November 4, 2024 | echo.epa.gov |
| TST Inc | Fontana | CA | 1 | $75,000 | 0 | January 29, 2026 | echo.epa.gov |
| Rio Bravo Rocklin | Lincoln | CA | 12 | $71,250 | 1 | August 27, 2024 | echo.epa.gov |
| Sunrise Power Company, LLC | Fellows | CA | 6 | $67,988 | 0 | July 20, 2023 | echo.epa.gov |
| Dte Stockton, LLC | Stockton | CA | 8 | $60,386 | 5 | October 24, 2024 | echo.epa.gov |
| Pg&e Seaport Spoils Yard | Redwood City | CA | 1 | $55,500 | 1 | September 11, 2025 | echo.epa.gov |
| Los Medanos Energy Center | Pittsburg | CA | 2 | $46,090 | 12 | December 12, 2024 | echo.epa.gov |
| Delta Energy Center | Pittsburg | CA | 2 | $40,000 | 12 | December 5, 2024 | echo.epa.gov |
| Long Beach Generating Station | Long Beach | CA | 1 | $39,000 | 1 | October 25, 2024 | echo.epa.gov |
| University of California, Berkeley | Berkeley | CA | 8 | $27,000 | 12 | January 28, 2026 | echo.epa.gov |
| Aes Redondo Beach, LLC | Redondo Beach | CA | 2 | $27,000 | 12 | January 24, 2024 | echo.epa.gov |
| Panoche Energy Center, LLC Class 1 Well #iw4 | Firebaugh | CA | 4 | $25,184 | 3 | June 17, 2024 | echo.epa.gov |
| Clearlight Energy Sanger LLC | Sanger | CA | 11 | $25,000 | 11 | April 27, 2023 | echo.epa.gov |
| Genesis Solar LLC | Blythe | CA | 2 | $25,000 | 0 | January 12, 2026 | echo.epa.gov |
| Linn Operating Inc | Kern (subdivision) | CA | 10 | $24,500 | 4 | May 31, 2023 | echo.epa.gov |
| San Onofre Nuclear Generating Station Unit 2 | San Clemente | CA | 1 | $24,000 | 0 | August 28, 2023 | echo.epa.gov |
| Foothill Sanitary Landfill | Linden | CA | 15 | $23,000 | 12 | May 23, 2024 | echo.epa.gov |
| Almond Power Plant | Modesto | CA | 10 | $22,000 | 3 | August 5, 2024 | echo.epa.gov |
| Crockett Cogen Project | Crockett | CA | 10 | $21,000 | 12 | April 1, 2025 | echo.epa.gov |
| Delano Energy Center LLC | Delano | CA | 8 | $21,000 | 0 | July 11, 2022 | echo.epa.gov |
| Altagas Ripon Energy Inc. | Ripon | CA | 4 | $20,000 | 1 | February 5, 2024 | echo.epa.gov |
| Kings River Conservation District Peaker Plant | Fresno | CA | 4 | $19,380 | 0 | April 4, 2023 | echo.epa.gov |
| Mckittrick Limited | Bakersfield | CA | 1 | $19,363 | 0 | June 9, 2025 | echo.epa.gov |
| Rio Bravo Fresno | Fresno | CA | 9 | $19,080 | 12 | September 3, 2024 | echo.epa.gov |
| Haynes Generating Station | Long Beach | CA | 2 | $18,000 | 0 | June 20, 2024 | echo.epa.gov |
| Recology-Hay Road Landfill(norcal Waste) | Vacaville | CA | 2 | $18,000 | 0 | July 30, 2025 | echo.epa.gov |
| Fresno Cogeneration Partners | San Joaquin | CA | 20 | $16,446 | 4 | December 2, 2024 | echo.epa.gov |
| Wellhead Power Panoche, LLC | Firebaugh | CA | 6 | $15,850 | 12 | November 20, 2024 | echo.epa.gov |
| Calpeak Power, Panoche LLC | Firebaugh | CA | 4 | $15,500 | 0 | October 3, 2023 | echo.epa.gov |
| Aes Alamitos LLC | Long Beach | CA | 2 | $15,000 | 3 | May 22, 2024 | echo.epa.gov |
| La Paloma Generating Plant | MC Kittrick | CA | 8 | $14,700 | 4 | October 9, 2024 | echo.epa.gov |
| E. F. Oxnard, Inc. | Oxnard | CA | 2 | $14,370 | 0 | October 22, 2024 | echo.epa.gov |
| Escondido City of | Escondido | CA | 1 | $12,000 | 0 | December 6, 2024 | echo.epa.gov |
| So Cal Edison Co | Compton | CA | 1 | $12,000 | 0 | December 11, 2024 | echo.epa.gov |
| Northern California Power | Lodi | CA | 5 | $11,400 | 0 | July 17, 2023 | echo.epa.gov |
| Merced Power LLC | Merced | CA | 5 | $10,900 | 12 | November 7, 2022 | echo.epa.gov |
| Forward Inc Landfill | Manteca | CA | 11 | $10,000 | 12 | November 3, 2022 | echo.epa.gov |
| Tracy Combined Cycle Power Plant | Tracy | CA | 2 | $10,000 | 0 | April 20, 2022 | echo.epa.gov |
| Wolfskill Energy Center | Fairfield | CA | 1 | $10,000 | 9 | January 4, 2022 | echo.epa.gov |
| Calpine Gilroy Cogen LP & Gilroy Energy Center LLC | Gilroy | CA | 1 | $9,000 | 0 | April 9, 2025 | echo.epa.gov |
| Combustion Turbine No. 2/lodi Energy Center | Lodi | CA | 2 | $8,400 | 0 | July 17, 2023 | echo.epa.gov |
| MM Tulare Energy LLC Visalia Landfill | Visalia | CA | 2 | $8,200 | 4 | September 11, 2024 | echo.epa.gov |
| Walnut Energy Center | Turlock | CA | 8 | $8,000 | 1 | November 13, 2023 | echo.epa.gov |
| Kern Front Limited | Bakersfield | CA | 2 | $8,000 | 0 | October 31, 2023 | echo.epa.gov |
| Vasco Road Landfill | Livermore | CA | 1 | $8,000 | 12 | May 13, 2025 | echo.epa.gov |
| Pastoria Energy Facility | Lebec | CA | 2 | $7,500 | 0 | April 24, 2023 | echo.epa.gov |
| All American Oil & Gas Co | Bakersfield | CA | 4 | $6,500 | 0 | October 5, 2023 | echo.epa.gov |
| Chevron Cogeneration Company | Bakersfield | CA | 2 | $5,000 | 3 | May 7, 2026 | echo.epa.gov |
| Kingsburg Cogeneration Facility | Kingsburg | CA | 2 | $3,000 | 0 | April 6, 2023 | echo.epa.gov |
| El Estero WWTP | Santa Barbara | CA | 1 | $3,000 | 0 | June 12, 2025 | echo.epa.gov |
| Bear Mountain LTD | Bakersfield | CA | 4 | $2,100 | 0 | December 8, 2022 | echo.epa.gov |
| Pasadena Water & Power City Yards Facility | Pasadena | CA | 1 | $2,000 | 0 | April 3, 2024 | echo.epa.gov |
| Ampersand Chowchilla Biomass, LLC | Chowchilla | CA | 4 | $1,600 | 12 | April 10, 2023 | echo.epa.gov |
| Ormat / North Brawley | Brawley | CA | 1 | $1,600 | 0 | February 23, 2024 | echo.epa.gov |
| San Jose State University (cogen Plant) | San Jose | CA | 1 | $1,000 | 12 | June 24, 2022 | echo.epa.gov |
| Brentwood Wastewater Treatment Plant | Brentwood | CA | 2 | $0 | 0 | | echo.epa.gov |
| Chiquita Canyon S Landfill | Castaic | CA | 2 | $0 | 0 | | echo.epa.gov |
| Imperial Irrigation District | Imperial | CA | 2 | $0 | 0 | | echo.epa.gov |
| Shasta-Sustainable Resource Management Inc. | Anderson | CA | 2 | $0 | 0 | | echo.epa.gov |
| City of Santa Clara, Silicon Valley Powe | Santa Clara | CA | 1 | $0 | 12 | | echo.epa.gov |
| Torrance Refining Company, LLC | Torrance | CA | 1 | $0 | 2 | | echo.epa.gov |
| City of Burbank Public Service Department | Burbank | CA | 1 | $0 | 0 | | echo.epa.gov |
| Live Oak Limited | Bakersfield | CA | 1 | $0 | 0 | | echo.epa.gov |
| Livermore-Amador Valley Water Management Agency | Pleasanton | CA | 1 | $0 | 0 | | echo.epa.gov |
| Los Angeles Dept of Water and Power | Los Angeles | CA | 1 | $0 | 0 | | echo.epa.gov |
| Sunshine Gas Producers LLC | Sylmar | CA | 1 | $0 | 0 | | echo.epa.gov |
| Aes Placerita, Inc. | Newhall | CA | 0 | $0 | 12 | | echo.epa.gov |
| Air Products MFG Stockton Cogen | Stockton | CA | 0 | $0 | 12 | | echo.epa.gov |
| Chevron USA Holdings Inc, Kern River Cogeneration Co | Bakersfield | CA | 0 | $0 | 12 | | echo.epa.gov |
| City of Anaheim/comb Turbine Gen Station | Anaheim | CA | 0 | $0 | 12 | | echo.epa.gov |
| Corona Energy Partners | Corona | CA | 0 | $0 | 12 | | echo.epa.gov |
| Humboldt Redwood Company LLC | Scotia | CA | 0 | $0 | 12 | | echo.epa.gov |
| J&a Santa Maria, Church ST | Santa Maria | CA | 0 | $0 | 12 | | echo.epa.gov |
| Madera Power, LLC | Madera | CA | 0 | $0 | 12 | | echo.epa.gov |
| NRG Energy Center San Francisco | San Francisco | CA | 0 | $0 | 12 | | echo.epa.gov |
| Phillips 66 Company Wilmington Plant | Wilmington | CA | 0 | $0 | 12 | | echo.epa.gov |
| Russell City Energy Company, LLC | Hayward | CA | 0 | $0 | 12 | | echo.epa.gov |
| Sierra Pacific Industries Lincoln Div | Lincoln | CA | 0 | $0 | 12 | | echo.epa.gov |
| Desert View Power Inc | Mecca | CA | 0 | $0 | 11 | | echo.epa.gov |
| Goose Haven Energy Center | Suisun City | CA | 0 | $0 | 9 | | echo.epa.gov |
| Moss Landing Power Plant | Moss Landing | CA | 0 | $0 | 5 | | echo.epa.gov |
| Metcalf Energy Center, LLC | San Jose | CA | 0 | $0 | 4 | | echo.epa.gov |
| Pg&e Diablo Canyon | Avila Beach | CA | 0 | $0 | 3 | | echo.epa.gov |
By program
| Program | Facilities | Formal actions | Informal actions | Penalties | Facilities with quarters in significant noncompliance |
|---|
| Clean Air Act | 81 | 308 | 224 | $1,498,115 | 48 |
| Clean Water Act | 41 | 27 | 21 | $2,730,000 | 9 |
| Hazardous waste (RCRA) | 74 | 5 | 32 | $666,258 | 4 |
| Drinking water (SDWA) | 2 | 0 | 1 | $0 | 0 |
Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.