Data / Environmental compliance / California / Oakland Power Plant
Oakland Power Plant, Oakland, CA: $238,500 in penalties
Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).
EPA's ECHO database records 2 inspections, 1 informal enforcement action and 3 formal enforcement actions at Oakland Power Plant, 50 Martin Luther King, Oakland, CA 94607, in the five years to November 1, 2026. Penalties total $238,500, the latest $7,500 on February 2, 2023. The facility was in significant noncompliance in 12 of the last 12 quarters.
The request: Get every facility in Electric Power Generation, Transmission and Distribution in California with penalties and violations. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- Site
- 50 Martin Luther King, Oakland, CA 94607
- EPA registry ID (FRS)
- 110000786169
- Industry
- 221112 Fossil Fuel Electric Power Generation; 221122 Electric Power Distribution
- County
- Alameda County
- Programs
- Clean Air Act, Hazardous waste (RCRA)
- Compliance status
- Significant Violation
- Inspections
- 2, latest August 1, 2025
- Formal actions
- 3, latest May 22, 2023
- Informal actions
- 1, latest May 10, 2022
- Penalties
- $238,500 in 3 penalties
- ECHO facility report
- echo.epa.gov
By program
Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.
| Program | Inspections | Informal actions | Formal actions | Penalties | Latest penalty | Latest amount | Quarters with violations | Quarters in significant noncompliance | Status |
|---|---|---|---|---|---|---|---|---|---|
| Clean Air Act | 2 | 1 | 2 | $8,500 | February 2, 2023 | $7,500 | 12 | 12 | Violation Addressed; Local Has Lead Enforcement |
| Hazardous waste (RCRA) | 0 | 0 | 0 | $0 | $0 | 0 | 0 | No Violation Identified |
Federal enforcement cases
EPA cases that name this facility, newest first. The penalty is the whole case penalty, shared with the other facilities named in the case.
| Case | Case name | Status date | Type | Status | Outcome | Statutes | Case penalty | Facilities in case | Source |
|---|---|---|---|---|---|---|---|---|---|
| 09-2023-5042 | NRC Environmental Services (US Ecology), Dynegy Oakland Power Plant, CAFO | May 22, 2023 | Administrative, Formal | Closed | Final Order With Penalty | Resource Conservation and Recovery Act | $230,000 | 2 | echo.epa.gov |
Also on SpecStream
- Environmental compliance in Electric Power Generation, Transmission and Distribution in California
- Environmental compliance in California
Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.