Skip to the page

Data / Environmental compliance / California / MT. Poso Cogeneration Facility

MT. Poso Cogeneration Facility, Bakersfield, CA: $100,000 in penalties, 5 formal enforcement actions (EPA ECHO)

EPA's ECHO database records 6 inspections, 2 informal enforcement actions and 5 formal enforcement actions at MT. Poso Cogeneration Facility, 36157 Famoso Rd., Bakersfield, CA 93308, in the five years to November 1, 2026. Penalties total $100,000, the latest $35,000 on February 29, 2024. The facility was in significant noncompliance in 12 of the last 12 quarters.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
36157 Famoso Rd., Bakersfield, CA 93308
EPA registry ID (FRS)
110000481657
Industry
22111 Electric Power Generation; 221112 Fossil Fuel Electric Power Generation; 221117 Biomass Electric Power Generation; 221122 Electric Power Distribution
County
Kern
Programs
Clean Air Act, Hazardous waste (RCRA)
Compliance status
Significant Violation
Inspections
6, latest July 13, 2026
Formal actions
5, latest February 29, 2024
Informal actions
2, latest September 14, 2022
Penalties
$100,000 in 5 penalties
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Air Act525$100,000February 29, 2024$35,0001212Violation Unaddressed; Local Has Lead Enforcement
Hazardous waste (RCRA)100$0$000No Violation Identified

Also on SpecStream

Updated November 7, 2026. Read from US EPA, Enforcement and Compliance History Online (ECHO). Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.