Data / Mines / Central Pre-Mix Concrete Co.
Central Pre-Mix Concrete Co.: 186 MSHA citations
Updated November 6, 2026. Source: US Department of Labor, Mine Safety and Health Administration (MSHA), Open Government Data Sets.
Central Pre-Mix Concrete Co. (MSHA operator ID L00029) operates 23 open mines with 158 employees in Oregon, Washington, mostly construction sand and gravel. Since January 1, 2022 MSHA inspectors issued it 186 citations and orders with $53,074 in proposed penalties, and it reported 34 injury or illness cases. Data from MSHA, November 6, 2026.
The request: Watch Central Pre-Mix Concrete Co. (MSHA operator ID L00029): each new citation, each accident report and each new mine. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads the mine, citation, inspection and accident files that MSHA publishes, and this page is that reading. Ask for the mines of a commodity, state or operator with the operator's headquarters, website and size added from the web, and new mines, new citations and new accident reports arrive in your sheet, CRM, Slack or agent as MSHA posts them.
- MSHA operator ID
- L00029
- Open mines
- 23
- Employees at open mines
- 158
- States
- Oregon, Washington
- Parent company
- CRH PLC
- Citations and orders since January 1, 2022
- 186
- Significant and substantial
- 23 (12.4%)
- Closure orders
- 6
- High negligence or reckless
- 9
- Proposed penalties
- $53,074
- Amount paid so far
- $47,528
- Inspections
- 182
- Inspector hours on site
- 1,091
- Citations per inspection
- 1.02 (all mines 2.30)
- Accident reports
- 38
- Injury and illness cases
- 34
- Fatalities
- 0
- Latest MSHA record
- November 3, 2026
Open mines of Central Pre-Mix Concrete Co.
Ranked by citations since January 1, 2022.
| Mine | Operator | County | Main commodity | Employees | Citations since 2022 |
|---|---|---|---|---|---|
| East Valley | Central Pre-Mix Concrete Co. | Yakima County, WA | Construction sand and gravel | 9 | 37 |
| Auburn Facility | Central Pre-Mix Concrete Co. | King County, WA | Construction sand and gravel | 3 | 31 |
| Umpqua Sand & Gravel Pit | Central Pre-Mix Concrete Co. | Douglas County, OR | Construction sand and gravel | 13 | 16 |
| Portable Crusher No 1 | Central Pre-Mix Concrete Co. | Yamhill County, OR | Crushed, broken stone | 12 | 15 |
| Laurelwood Quarry | Central Pre-Mix Concrete Co. | Washington County, OR | Crushed, broken stone | 4 | 14 |
| RiverBend Materials Dalton | Central Pre-Mix Concrete Co. | Polk County, OR | Crushed, broken stone | 7 | 13 |
| RiverBend Materials Windsor | Central Pre-Mix Concrete Co. | Marion County, OR | Crushed, broken stone | 20 | 12 |
| RiverBend Materials Turner South | Central Pre-Mix Concrete Co. | Marion County, OR | Construction sand and gravel | 7 | 12 |
| Wilbur Division | Central Pre-Mix Concrete Co. | Douglas County, OR | Construction sand and gravel | 5 | 12 |
| Allied Rock Portable Crusher #1 | Central Pre-Mix Concrete Co. | Marion County, OR | Crushed, broken stone | 5 | 11 |
| RiverBend Materials North Pit | Central Pre-Mix Concrete Co. | Lane County, OR | Construction sand and gravel | 9 | 10 |
| Stephens Quarry | Central Pre-Mix Concrete Co. | Yamhill County, OR | Crushed, broken traprock | 5 | 10 |
| RiverBend Materials RiverBend West | Central Pre-Mix Concrete Co. | Marion County, OR | Construction sand and gravel | 9 | 9 |
| RiverBend Materials Corvallis | Central Pre-Mix Concrete Co. | Benton County, OR | Construction sand and gravel | 10 | 7 |
| Allied Rock Portable Crusher #3 | Central Pre-Mix Concrete Co. | Sherman County, OR | Crushed, broken stone | 3 | 7 |
| Portable Plant | Central Pre-Mix Concrete Co. | Douglas County, OR | Crushed, broken stone | 4 | 5 |
| Portable Screening Plant | Central Pre-Mix Concrete Co. | Hood River County, OR | Construction sand and gravel | 3 | 5 |
| RiverBend Materials Coburg | Central Pre-Mix Concrete Co. | Lane County, OR | Construction sand and gravel | 11 | 4 |
| RiverBend Materials Hilroy | Central Pre-Mix Concrete Co. | Marion County, OR | Construction sand and gravel | 8 | 3 |
| Sullivan Road Facility | Central Pre-Mix Concrete Co. | Spokane County, WA | Construction sand and gravel | 6 | 3 |
| Allied Rock Portable Crusher #2 | Central Pre-Mix Concrete Co. | Marion County, OR | Crushed, broken stone | 2 | 3 |
| Umpqua Mobile Crushing | Central Pre-Mix Concrete Co. | Marion County, OR | Crushed, broken stone | 2 | 0 |
| Hawthorne | Central Pre-Mix Concrete Co. | Spokane County, WA | Construction sand and gravel | 1 | 0 |
Citations and injury cases by year
Calendar years since 2022; 2026 runs to the date of the MSHA files.
| Year | Citations and orders | Significant and substantial | Proposed penalties | Injury and illness cases |
|---|---|---|---|---|
| 2022 | 49 | 7 | $8,291 | 3 |
| 2023 | 31 | 8 | $19,399 | 9 |
| 2024 | 39 | 2 | $10,901 | 8 |
| 2025 | 31 | 2 | $9,227 | 9 |
| 2026 | 36 | 4 | $5,256 | 5 |
Standards cited most at Central Pre-Mix Concrete Co.
Sections of Title 30 of the Code of Federal Regulations named on the citations, with the part each belongs to.
| Standard | What the part covers | Citations |
|---|---|---|
| 30 CFR 56.14100 | Surface metal and nonmetal mines | 14 |
| 30 CFR 56.12004 | Surface metal and nonmetal mines | 14 |
| 30 CFR 56.14107 | Surface metal and nonmetal mines | 12 |
| 30 CFR 56.14112 | Surface metal and nonmetal mines | 12 |
| 30 CFR 56.11001 | Surface metal and nonmetal mines | 11 |
| 30 CFR 56.20003 | Surface metal and nonmetal mines | 11 |
| 30 CFR 56.14110 | Surface metal and nonmetal mines | 8 |
| 30 CFR 56.12008 | Surface metal and nonmetal mines | 6 |
| 30 CFR 56.4201 | Surface metal and nonmetal mines | 6 |
| 30 CFR 56.11002 | Surface metal and nonmetal mines | 6 |
| 30 CFR 56.9300 | Surface metal and nonmetal mines | 6 |
| 30 CFR 56.12023 | Surface metal and nonmetal mines | 5 |
| 30 CFR 56.14132 | Surface metal and nonmetal mines | 5 |
| 30 CFR 56.12032 | Surface metal and nonmetal mines | 5 |
| 30 CFR 56.14207 | Surface metal and nonmetal mines | 4 |
Injury and illness cases at Central Pre-Mix Concrete Co.
Accident reports by degree of injury, as the operator reported them to MSHA.
| Degree | Cases |
|---|---|
| Days away from work or restricted activity | 30 |
| No lost time, or an occupational illness | 4 |
What the accident reports at Central Pre-Mix Concrete Co. describe
Accident classification, as MSHA codes the circumstances that contributed most directly.
| Classification | Reports |
|---|---|
| Handling of materials | 17 |
| Slip or fall of person | 7 |
| Other | 6 |
| Handtools (nonpowered) | 3 |
| Machinery | 2 |
| Powered haulage | 2 |
| Stepping or kneeling on object | 1 |
Equipment named in accident reports at Central Pre-Mix Concrete Co.
| Equipment | Reports |
|---|---|
| Hand tools (not powered) | 4 |
| Front-end loader | 2 |
| Bench grinder | 1 |
| Trucks | 1 |
| Welding machine | 1 |
Commodities
| Main commodity | Open mines |
|---|---|
| Construction sand and gravel | 13 |
| Crushed, broken stone | 9 |
| Crushed, broken traprock | 1 |
US government work, public domain. Counts come from the MSHA files published on November 6, 2026. An open mine is one MSHA lists as Active, Intermittent, New Mine, Temporarily Idled or NonProducing; 13,673 were open that day. Citations, penalties, inspections and accident reports run from January 1, 2022. A citation is an inspector's allegation and an operator can contest it; the penalty is the amount MSHA first proposed, before any contest or settlement. An operator is the legal entity MSHA assesses, and a parent company is its controller. Mines run by sole proprietors or by individuals are counted in every total and are not named. This page uses MSHA data and is not endorsed or certified by MSHA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.