Skip to the page

Data / Mines / Illinois / Willow Lake Central Preparation Plant

Willow Lake Central Preparation Plant: 4 MSHA citations

Updated November 6, 2026. Source: US Department of Labor, Mine Safety and Health Administration (MSHA), Open Government Data Sets.

Willow Lake Central Preparation Plant is a nonproducing coal (bituminous) processing facility in Saline County, Illinois, operated by Big Ridge, Inc. with 1 employee on MSHA's record (mine ID 1103099). Since January 1, 2022 MSHA inspectors issued 4 citations and orders there with $1,645 in proposed penalties, and 0 accident reports were filed there, with no injury or illness cases.

The request: Watch Willow Lake Central Preparation Plant (MSHA mine ID 1103099) in Saline County, Illinois: each new citation and each accident report. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads the mine, citation, inspection and accident files that MSHA publishes, and this page is that reading. Ask for the mines of a commodity, state or operator with the operator's headquarters, website and size added from the web, and new mines, new citations and new accident reports arrive in your sheet, CRM, Slack or agent as MSHA posts them.

MSHA mine ID
1103099
Status
NonProducing since January 28, 2020
Main commodity
Coal (bituminous)
Mine type
Facility
County
Saline County, Illinois
Nearest town
Equality
Operator
Big Ridge, Inc.
Parent company
Peabody Energy Corporation
Employees
1
MSHA field office
Madisonville KY Field Office
Citations and orders since January 1, 2022
4
Significant and substantial
1 (25.0%)
Closure orders
0
High negligence or reckless
1
Proposed penalties
$1,645
Amount paid so far
$399
Inspections
21
Inspector hours on site
208
Citations per inspection
0.19 (all mines 2.30)
Accident reports
0
Injury and illness cases
0
Fatalities
0
Latest MSHA record
October 29, 2026
Citations issued to contractors here
4 ($651 proposed)

Citations and injury cases by year

Calendar years since 2022; 2026 runs to the date of the MSHA files.

YearCitations and ordersSignificant and substantialProposed penaltiesInjury and illness cases
202230$3990
202311$1,2460

Standards cited most at Willow Lake Central Preparation Plant

Sections of Title 30 of the Code of Federal Regulations named on the citations, with the part each belongs to.

StandardWhat the part coversCitations
30 CFR 77.1606Surface coal mines, safety2
30 CFR 77.1605Surface coal mines, safety1
30 CFR 77.1110Surface coal mines, safety1

Other open mines in Saline County, Illinois

MineOperatorCountyMain commodityEmployeesCitations since 2022
New Era MineIllinois Land Resources, Inc.Saline County, ILCoal (bituminous)21

US government work, public domain. Counts come from the MSHA files published on November 6, 2026. An open mine is one MSHA lists as Active, Intermittent, New Mine, Temporarily Idled or NonProducing; 13,673 were open that day. Citations, penalties, inspections and accident reports run from January 1, 2022. A citation is an inspector's allegation and an operator can contest it; the penalty is the amount MSHA first proposed, before any contest or settlement. An operator is the legal entity MSHA assesses, and a parent company is its controller. Mines run by sole proprietors or by individuals are counted in every total and are not named. This page uses MSHA data and is not endorsed or certified by MSHA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.