Data / Federal awards / NAICS 238220 / KOMAN SUSTAINABLE SOLUTIONS, LLC
KOMAN SUSTAINABLE SOLUTIONS, LLC: 122 federal contract awards, $45.9 million obligated (FY2024 to FY2027)
Updated October 6, 2026. Source: USAspending.gov.
KOMAN SUSTAINABLE SOLUTIONS, LLC (UEI YYHUS62QE615), Anchorage, AK, received 122 federal prime contract awards with $45.9 million obligated in fiscal years 2024 to 2027, from 3 agencies under 7 NAICS codes. Its largest buyer is Department of Defense ($39.5 million) and its largest code is NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors.
The request: Every federal contract awarded under NAICS 238220, with the winner, the agency and the value. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads every federal contract award on USAspending.gov and every open opportunity on SAM.gov, and this page is that reading. Ask for the awards in your niche and the winners, agencies, values and recompetes arrive in your sheet, CRM, Slack or agent as they are reported.
- YYHUS62QE615UEI
- Anchorage, AKLocation
- Small BusinessBusiness size
- 122Contract awards
- $45.9 millionObligated
- 2023-10-02First action in window
- 2026-09-21Latest action
Where the work is
NAICS codes, with the other winners in each.
| NAICS | Industry | Awards | Obligated |
|---|---|---|---|
| 238220 | Plumbing, Heating, and Air-Conditioning Contractors | 80 | $22.2 million |
| 236220 | Commercial and Institutional Building Construction | 24 | $13.9 million |
| 531120 | Lessors of Nonresidential Buildings (except Miniwarehouses) | 7 | $6.4 million |
| 238990 | All Other Specialty Trade Contractors | 2 | $3.2 million |
| 237310 | Highway, Street, and Bridge Construction | 1 | $231,433 |
| 337214 | Office Furniture (except Wood) Manufacturing | 1 | $110,955 |
| 236210 | Industrial Building Construction | 7 | $0 |
Buying agencies
| Agency | Awards | Obligated |
|---|---|---|
| Department of Defense | 112 | $39.5 million |
| Department of the Interior | 1 | $6.6 million |
| Department of Homeland Security | 9 | $-242,589 |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2024 | $27.7 million |
| FY2025 | $12.5 million |
| FY2026 | $5.7 million |
Contract awards
The 50 largest of 122 awards by dollars obligated in fiscal years 2024 to 2027.
| Award ID | Agency | Type | NAICS | What it buys | Obligated in window | Award value | Starts | Ends | Place of performance | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| 140P2023C0104 | Department of the Interior | Definitive Contract | 236220 | LYJO 290111 & 316068 - REHABILITATE TEXAS WHITE HOUSE & REHABILITATE HANGAR BUILDING, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK | $6,628,792 | $18,036,945 | September 26, 2023 | December 18, 2026 | Johnson City, TX | usaspending.gov |
| W9127822C0036 | Department of Defense | Definitive Contract | 531120 | MACDILL AIR FORCE BASE MISO IV MODULAR TRAILER LEASE | $3,213,680 | $8,913,565 | September 29, 2022 | October 30, 2028 | Tampa, FL | usaspending.gov |
| W9124923C0026 | Department of Defense | Definitive Contract | 238990 | DE05377-2P BF001 REPAIR BARTON FIELD TRA | $3,176,051 | $5,703,667 | September 25, 2023 | April 20, 2026 | Fort Gordon, GA | usaspending.gov |
| FA706024C0008 | Department of Defense | Definitive Contract | 238220 | PKB - PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS, TO COMPLETE THE REPLACEMENT OF THE HV | $2,826,770 | $2,869,540 | July 31, 2024 | November 3, 2025 | Washington, DC | usaspending.gov |
| W9124924C0016 | Department of Defense | Definitive Contract | 238220 | 810043G-2P BLDG. 900 REPLACE COOLING | $2,561,885 | $2,561,885 | October 3, 2024 | June 22, 2026 | Fort Gordon, GA | usaspending.gov |
| W9128F26CA020 | Department of Defense | Definitive Contract | 236220 | 569262 - FIBER TO BARRACKS EMCS, FORT CARSON, CO SBA ACCEPTANCE S SP1753888663J | $2,344,078 | $2,344,078 | March 30, 2026 | March 26, 2027 | Colorado Springs, CO | usaspending.gov |
| W9124925CA031 | Department of Defense | Definitive Contract | 236220 | DE05092-0P B44401 REPAIR RCX | $1,776,462 | $1,776,462 | September 29, 2025 | December 8, 2026 | Augusta, GA | usaspending.gov |
| N4008025F0056 | Department of Defense | Delivery Order | 531120 | BASE PERIOD - RECURRING LR167 LEASE | $1,520,267 | $1,520,267 | January 14, 2025 | January 13, 2026 | Patuxent River, MD | usaspending.gov |
| N4008026F1028 | Department of Defense | Delivery Order | 531120 | BUILDING LR-167 LEASE OPTION YEAR 1 FUNDING TASK ORDER | $1,520,267 | $1,520,267 | January 14, 2026 | January 13, 2027 | Patuxent River, MD | usaspending.gov |
| FA706025F0117 | Department of Defense | Delivery Order | 238220 | PKB - BUILDING MANAGEMENT SYSTEM UPGRADE B399 | $1,125,706 | $1,125,706 | September 22, 2025 | August 18, 2026 | Washington, DC | usaspending.gov |
| FA706024F0099 | Department of Defense | Delivery Order | 238220 | PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN ACCORDANCE WITH THE STATEMENT | $1,095,050 | $1,095,050 | August 29, 2024 | November 20, 2025 | Washington, DC | usaspending.gov |
| FA302024F0135 | Department of Defense | Delivery Order | 236220 | DESIGN-BUILD TO REPAIR BRICK SPALLS, REPAIR EXTERIOR ARCHITECTURAL CONCRETE FACADE AND APPLY TEXTURE SEAL COATING, REPAIR STONE COPING PARAP | $1,086,162 | $1,086,162 | July 15, 2024 | July 7, 2025 | Sheppard Afb, TX | usaspending.gov |
| 70B01C24F00000007 | Department of Homeland Security | Delivery Order | 236210 | LAREDO REPAIRS | $961,339 | $961,339 | November 2, 2023 | July 23, 2024 | Laredo, TX | usaspending.gov |
| FA706024F0019 | Department of Defense | Delivery Order | 238220 | INSTALL HIGH VOLTAGE LINE AND PANEL IN BILLY MITCHELL ESTATES, JBAB | $926,071 | $926,071 | December 21, 2023 | June 18, 2024 | Washington, DC | usaspending.gov |
| FA706024F0061 | Department of Defense | Delivery Order | 238220 | PKB - THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL AND EQUIPMENT NECESSARY TO DEMO TWENTY-TWO (22) CLASSROOM VENTILATOR UNITS AND REM | $820,683 | $820,683 | June 25, 2024 | March 24, 2025 | Washington, DC | usaspending.gov |
| FA706024F0112 | Department of Defense | Delivery Order | 238220 | PKB - B3617 INSTALL CHILLER AND REPLACE PUMPS AND HVU | $820,144 | $820,144 | September 9, 2024 | October 24, 2025 | Washington, DC | usaspending.gov |
| FA706025F0100 | Department of Defense | Delivery Order | 238220 | PKB - THIS PROCUREMENT REQUIRES THE REMOVAL AND REPLACEMENT OF ONE (1) AIR HANDLING UNIT (AHU), AHU #19 SERVING ROOMS 230 AND 230A LOCATED O | $762,942 | $762,942 | September 1, 2025 | September 1, 2026 | Washington, DC | usaspending.gov |
| FA706025F0082 | Department of Defense | Delivery Order | 238220 | B399 - REPLACE HVAC UNITS 2-5 PHASE 2 | $758,663 | $758,663 | August 6, 2025 | June 2, 2026 | Washington, DC | usaspending.gov |
| FA706025F0021 | Department of Defense | Delivery Order | 238220 | PKB - INSTALLATION OF TEMPORARY BOILER AT B20 JOINT BASE ANACOSTIA BOLLING FOLLOWED BY FULL BOILER AND PUMP REPLACEMENT. | $727,325 | $727,325 | December 11, 2024 | September 11, 2025 | Washington, DC | usaspending.gov |
| FA706024F0116 | Department of Defense | Delivery Order | 238220 | PKB-THE PROCUREMENT REQUIRES THE REPLACEMENT OF EXISTING 12-INCH AND 8-INCH DOMESTIC WATER LINES AND VALVES ON THE WEST SIDE OF B168 WITH C9 | $640,194 | $640,194 | September 11, 2024 | November 5, 2025 | Washington, DC | usaspending.gov |
| FA441924F0074 | Department of Defense | Delivery Order | 236220 | B18 ROOF RENOVATION AT ALTUS AFB OK. THIS PROJECT CONSISTS OF REPLACING THE SINGLE-PLY ROOF SYSTEM WITH A NEW FULLY ADHERED ETHYLENE - PROPY | $582,947 | $582,947 | June 3, 2024 | September 26, 2024 | Altus Afb, OK | usaspending.gov |
| FA706024F0105 | Department of Defense | Delivery Order | 238220 | PKB - CONTRACTOR SHALL REMOVE AND REPLACE FOUR (4) AIR HANDLING UNITS (AHUS) ON THE FIRST FLOOR OF BUILDING 399 IN ACCORDANCE WITH (IAW) THE | $563,369 | $563,369 | September 5, 2024 | December 1, 2025 | Washington, DC | usaspending.gov |
| FA460022F0131 | Department of Defense | Delivery Order | 236220 | ISOLATE AND ABANDON TWO (2) CLOSED LOOP GEOTHERMAL GROUND WELL SYSTEM AND A FULL-DEPTH REPLACEMENT OF 95,000 SQ. FT. PARKING LOT THAT SITS A | $519,601 | $3,610,448 | October 3, 2022 | November 29, 2024 | Offutt Afb, NE | usaspending.gov |
| FA706025F0053 | Department of Defense | Delivery Order | 238220 | PROVIDE ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN THIS STATEMENT OF WORK (SOW). | $444,738 | $444,738 | April 28, 2025 | April 28, 2026 | Washington, DC | usaspending.gov |
| FA706025F0050 | Department of Defense | Delivery Order | 238220 | PKB - DEMOLISH AND REPLACE EXISTING BOILERS AND HVACS IN B353/354, AND 355 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $436,159 | $436,159 | April 17, 2025 | December 15, 2025 | Washington, DC | usaspending.gov |
| FA441924F0057 | Department of Defense | Delivery Order | 236220 | BUILDING 225 ROOF REPLACEMENT. | $394,666 | $394,666 | March 4, 2024 | May 24, 2024 | Altus, OK | usaspending.gov |
| FA706024F0025 | Department of Defense | Delivery Order | 238220 | B417 FIRE ALARM, MOLD, WATER DAMAGE, PAINT AND FLOORING | $392,617 | $392,617 | January 25, 2024 | October 21, 2024 | Washington, DC | usaspending.gov |
| FA706025F0118 | Department of Defense | Delivery Order | 238220 | THE PURPOSE OF THIS PROJECT IS TO REPAIR 11 CES METER PITS IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW). | $369,496 | $369,496 | September 15, 2025 | August 13, 2026 | Washington, DC | usaspending.gov |
| FA706024F0068 | Department of Defense | Delivery Order | 238220 | PKB-REPLACEMENT OF THE COOLING TOWER DRIVE MOTORS AT B16S CT1 AND CT2, REPLACEMENT OF COOLING TOWER POWERTRAIN COMPONENTS, UPGRADE INTEGRATE | $368,276 | $368,276 | July 3, 2024 | March 31, 2025 | Washington, DC | usaspending.gov |
| FA706024F0002 | Department of Defense | Delivery Order | 236220 | B370 AIR COOLED CHILLER | $346,359 | $346,359 | October 2, 2023 | July 9, 2024 | Washington, DC | usaspending.gov |
| FA706025F0090 | Department of Defense | Delivery Order | 238220 | PKB-B47 REPLACE HVAC COILS AND DAMPER MOTOR | $324,085 | $324,085 | August 21, 2025 | February 23, 2026 | Washington, DC | usaspending.gov |
| FA706024F0040 | Department of Defense | Delivery Order | 238220 | PKB - B72 INSTALL EMERGENCY TEMPORARY CHILLER AND INVESTIGATE HVAC CONTROLS | $316,246 | $316,246 | March 21, 2024 | October 17, 2024 | Washington, DC | usaspending.gov |
| FA706024F0014 | Department of Defense | Delivery Order | 238220 | B20 EMERGENCY WATERLINE REPAIR ON JBAB | $311,163 | $311,163 | December 5, 2023 | May 20, 2024 | Washington, DC | usaspending.gov |
| FA302924F0007 | Department of Defense | Delivery Order | 236220 | RENOVATE ROOMS 141,142, AND RESTROOMS IN FACILITY 415 (BASE EXCHANGE) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | $307,729 | $307,729 | October 1, 2024 | May 3, 2025 | Enid, OK | usaspending.gov |
| FA706025F0121 | Department of Defense | Delivery Order | 238220 | BUILDING 399 POWER DISTRIBUTION UNITS (PDUS) ARE AT THE END OF THEIR LIFE CYCLE. CUSTOMER REQUESTS TO REPLACE TWO (2) PDUS IN THE WHITE HOUS | $299,343 | $299,343 | September 22, 2025 | February 4, 2027 | Washington, DC | usaspending.gov |
| FA706025F0111 | Department of Defense | Delivery Order | 238220 | PKB - B398 REPAIR MOTOR GENERATOR SET AND CONTROL PANEL | $298,107 | $298,107 | September 22, 2025 | September 13, 2027 | Washington, DC | usaspending.gov |
| FA706024F0109 | Department of Defense | Delivery Order | 238220 | PKB-THE DEMO AND REPLACEMENT OF THREE (3) ROOFTOP AIR HANDLING UNITS FROM THE SITE AT B418 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (S | $283,071 | $283,071 | September 6, 2024 | March 5, 2025 | Washington, DC | usaspending.gov |
| FA706025F0062 | Department of Defense | Delivery Order | 238220 | PKB- REPLACE THE EXISTING AUTOMATIC TRANSFER SWITCH UNIT IN THE ELECTRICAL ROOM WITH A NEW, FULLY FUNCTIONAL UNIT. ALOS, ENSURE UNINTERRUPTE | $242,573 | $242,573 | August 8, 2025 | July 3, 2026 | Washington, DC | usaspending.gov |
| W9128F23C0044 | Department of Defense | Definitive Contract | 237310 | DESIGN AND CONSTRUCT REPAIR KENNEY GATE | $231,433 | $893,471 | September 29, 2023 | June 28, 2025 | Offutt Afb, NE | usaspending.gov |
| FA706024F0113 | Department of Defense | Delivery Order | 238220 | THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE ALL LABOR AND EQUIPMENT TO ACCOMPLISH THE REPAIR AND REPLACEMENT OF THE HIGH VOLTAGE SWITCH AT | $225,136 | $225,136 | September 10, 2024 | March 10, 2025 | Bolling Afb, DC | usaspending.gov |
| FA706024F0001 | Department of Defense | Delivery Order | 236220 | AIR COOLED CHILLER B362 JBAB | $219,357 | $219,357 | October 2, 2023 | June 20, 2024 | Washington, DC | usaspending.gov |
| FA706026F0011 | Department of Defense | Delivery Order | 238220 | PKB-B3610 REPLACE CHILLER | $201,986 | $201,986 | January 9, 2026 | July 8, 2026 | Washington, DC | usaspending.gov |
| FA706025F0134 | Department of Defense | Delivery Order | 238220 | THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE ALL LABOR AND EQUIPMENT TO ACCOMPLISH THE REMOVAL AND REPLACEMENT OF THE MULTIPLE AIR HANDLING | $179,685 | $179,685 | September 24, 2025 | February 23, 2026 | Washington, DC | usaspending.gov |
| FA706025F0030 | Department of Defense | Delivery Order | 238220 | PKB-PROJECT TITLE: B418 REPAIR GREASE DRAIN LINES FROM GREASE TRAP | $174,700 | $174,700 | January 29, 2025 | April 29, 2025 | Washington, DC | usaspending.gov |
| FA706025F0031 | Department of Defense | Delivery Order | 238220 | PKB - B417 REPLACE HOT WATER BOILERS | $163,389 | $163,389 | January 31, 2025 | July 30, 2025 | Washington, DC | usaspending.gov |
| FA706024F0111 | Department of Defense | Delivery Order | 238220 | PKB - THE PROCUREMENT REQUIRES ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK | $157,931 | $157,931 | September 6, 2024 | April 4, 2025 | Washington, DC | usaspending.gov |
| FA706024F0059 | Department of Defense | Delivery Order | 238220 | PKB - THIS TASK ORDER IS TO PROVIDE ALL LABOR AND EQUIPMENT TO ACCOMPLISH THE REPAIR AND REPLACEMENT OF THE HIGH VOLTAGE SWITCH AT B54 JOINT | $155,244 | $208,851 | June 7, 2024 | December 4, 2024 | Washington, DC | usaspending.gov |
| FA706023F0113 | Department of Defense | Delivery Order | 238220 | B93 HVAC REPAIR ON JOINT BASE ANACOSTIA-BOLLING | $151,835 | $670,982 | September 25, 2023 | December 16, 2024 | Washington, DC | usaspending.gov |
| FA706024F0155 | Department of Defense | Delivery Order | 238220 | PKB - URGENT HIGH VOLTAGE SWITCH REPAIR B60 JBAB. | $148,923 | $148,923 | September 30, 2024 | March 31, 2025 | Washington, DC | usaspending.gov |
| FA706024F0011 | Department of Defense | Delivery Order | 238220 | INSTALL OF WATER HEATING BYPASS B3619, JBAB | $147,740 | $147,740 | December 1, 2023 | January 3, 2024 | Washington, DC | usaspending.gov |
Also on SpecStream
- All recipients under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors
- All recipients under NAICS 236220 Commercial and Institutional Building Construction
- All recipients under NAICS 531120 Lessors of Nonresidential Buildings (except Miniwarehouses)
- Open opportunities under NAICS 238220
- Open opportunities under NAICS 236220
- Open opportunities under NAICS 531120
Public U.S. federal spending data (U.S. Department of the Treasury). Obligations are the contract actions dated in fiscal years 2024 to 2027 of the USAspending.gov award archive of 2026-10-06; a contract's total value is its current value as USAspending reports it, including earlier years. Recipients are matched on their SAM.gov UEI, never on the name, and are shown as the government prints them. Sole proprietorships and opted-out entities count in the totals and are not named. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.