Skip to the page

Data / Environmental compliance / Massachusetts / Weavers Cove Energy LLC

Weavers Cove Energy LLC, MA: $47,500 in penalties

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 1 formal enforcement action at Weavers Cove Energy LLC, One New Street, Fall River, MA 02720, in the five years to November 1, 2026. Penalties total $47,500, the latest $47,500 on September 14, 2022.

The request: Get every facility in Petroleum and Petroleum Products Merchant Wholesalers in Massachusetts with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
One New Street, Fall River, MA 02720
EPA registry ID (FRS)
110024770292
Industry
424710 Petroleum Bulk Stations and Terminals
County
Bristol
Programs
Clean Air Act, Clean Water Act
Compliance status
No Violation Identified
Inspections
None in five years; latest on record November 20, 2020
Formal actions
1, latest September 14, 2022
Informal actions
None in five years; latest on record August 9, 1990
Penalties
$47,500 in 1 penalty
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Air Act000$0$000No Violation Identified
Clean Water Act001$47,500September 14, 2022$47,50000No Violation Identified

Federal enforcement cases

EPA cases that name this facility, newest first. The penalty is the whole case penalty, shared with the other facilities named in the case.

CaseCase nameStatus dateTypeStatusOutcomeStatutesCase penaltyFacilities in caseSource
01-2022-2025Weaver's CoveSeptember 14, 2022Administrative, FormalFinal Order IssuedClean Water Act$47,5001echo.epa.gov

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.