Skip to the page

Data / Environmental compliance / Alabama / Tci of Alabama LLC

Tci of Alabama LLC, Pell City, AL: $11,680 in penalties

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 7 inspections, 3 informal enforcement actions and 1 formal enforcement action at Tci of Alabama LLC, 101 Parkway E, Pell City, AL 35125, in the five years to November 1, 2026. Penalties total $11,680, the latest $11,680 on May 6, 2025. The facility was in significant noncompliance in 3 of the last 12 quarters.

The request: Get every facility in Nonferrous Metal (except Aluminum) Production and Processing in Alabama with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
101 Parkway E, Pell City, AL 35125
EPA registry ID (FRS)
110011846725
Industry
331492 Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum); 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing; 423610 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers; 42393 Recyclable Material Merchant Wholesalers
County
Saint Clair
Programs
Clean Air Act, Clean Water Act, Hazardous waste (RCRA)
Compliance status
No Violation Identified
Inspections
7, latest September 30, 2026
Formal actions
1, latest May 6, 2025
Informal actions
3, latest February 24, 2025
Penalties
$11,680 in 1 penalty
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Air Act500$0$6,00000No Violation Identified
Clean Water Act110$0$000No Violation Identified
Hazardous waste (RCRA)121$11,680May 6, 2025$11,68053No Violation Identified

EPA inspections and evaluations

Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.

DateActivityTypeLaw
August 5, 2026Offsite Record ReviewFinancial Record ReviewToxic Substances Control Act
May 12, 2026Inspection/EvaluationPCBToxic Substances Control Act
September 23, 2025Offsite Record ReviewFinancial Record ReviewToxic Substances Control Act
May 22, 2025Inspection/EvaluationPCBToxic Substances Control Act
September 18, 2024Inspection/EvaluationPCBToxic Substances Control Act
August 15, 2023Offsite Record ReviewFinancial Record ReviewToxic Substances Control Act
August 2, 2023Inspection/EvaluationPCBToxic Substances Control Act
August 25, 2022Inspection/EvaluationPCBToxic Substances Control Act

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.