Skip to the page

Data / Environmental compliance / North Carolina / Tar River Water Treatment Plant

Tar River Water Treatment Plant, NC: $36,337 in penalties

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 2 inspections, 2 informal enforcement actions and 1 formal enforcement action at Tar River Water Treatment Plant, 4489 Leaston Road, Rocky Mount, NC 27803, in the five years to November 1, 2026. Penalties total $36,337, the latest $36,337 on June 8, 2026. The facility had violations in 5 of the last 12 quarters.

The request: Get every facility in Water, Sewage and Other Systems in North Carolina with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
4489 Leaston Road, Rocky Mount, NC 27803
EPA registry ID (FRS)
110009842965
Industry
22131 Water Supply and Irrigation Systems; 221310 Water Supply and Irrigation Systems
County
Nash
Programs
Clean Water Act
Compliance status
No Violation Identified
Inspections
2, latest April 17, 2024
Formal actions
1, latest June 8, 2026
Informal actions
2, latest September 5, 2025
Penalties
$36,337 in 1 penalty
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Water Act221$36,337June 8, 2026$36,33750No Violation Identified

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.