Skip to the page

Data / Environmental compliance / Virginia / Radford Army Ammunition Plant

Radford Army Ammunition Plant, VA: 8 quarters

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 4 inspections and 3 informal enforcement actions at Radford Army Ammunition Plant, 4050 Peppers Ferry Road, Radford, VA 24141, in the five years to November 1, 2026. No penalty is recorded in that period. The facility was in significant noncompliance in 8 of the last 12 quarters.

The request: Get every facility in Other Chemical Product and Preparation Manufacturing in Virginia with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
4050 Peppers Ferry Road, Radford, VA 24141
EPA registry ID (FRS)
110072238416
Industry
32592 Explosives Manufacturing; 332992 Small Arms Ammunition Manufacturing; 332993 Ammunition (except Small Arms) Manufacturing
County
Montgomery
Programs
Hazardous waste (RCRA)
Compliance status
Significant Violation
Inspections
4, latest March 2, 2026
Formal actions
None in five years; latest on record January 4, 2019
Informal actions
3, latest June 10, 2026
Penalties
None recorded in five years
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Hazardous waste (RCRA)430$0$76,086108Significant Noncomplier

EPA inspections and evaluations

Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.

DateActivityTypeLaw
November 3, 2025Offsite Record ReviewDesk AuditClean Water Act
September 3, 2025Information RequestFormalClean Water Act
August 29, 2023Inspection/EvaluationEvaluationResource Conservation and Recovery Act

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.