Data / Environmental compliance / Minnesota / Peoples Energy Cooperative
Peoples Energy Cooperative, MN: $14,553 in penalties
Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).
EPA's ECHO database records 1 inspection and 1 formal enforcement action at Peoples Energy Cooperative, 1775 Lake Shady Ave S, Oronoco, MN 55960, in the five years to November 1, 2026. Penalties total $14,553.
The request: Get every facility in Minnesota with penalties and violations. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- Site
- 1775 Lake Shady Ave S, Oronoco, MN 55960
- EPA registry ID (FRS)
- 110069012124
- County
- Olmsted
- Programs
- Hazardous waste (RCRA)
- Compliance status
- No Violation Identified
- Inspections
- 1, latest March 12, 2024
- Formal actions
- 1, latest August 26, 2025
- Informal actions
- None in five years
- Penalties
- $14,553 in 1 penalty
- ECHO facility report
- echo.epa.gov
By program
Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.
| Program | Inspections | Informal actions | Formal actions | Penalties | Latest penalty | Latest amount | Quarters with violations | Quarters in significant noncompliance | Status |
|---|---|---|---|---|---|---|---|---|---|
| Hazardous waste (RCRA) | 0 | 0 | 0 | $0 | $0 | 0 | 0 | No Violation Identified |
Federal enforcement cases
EPA cases that name this facility, newest first. The penalty is the whole case penalty, shared with the other facilities named in the case.
| Case | Case name | Status date | Type | Status | Outcome | Statutes | Case penalty | Facilities in case | Source |
|---|---|---|---|---|---|---|---|---|---|
| 05-2025-0174 | People's Cooperative Services (PCB) | August 26, 2025 | Administrative, Formal | Final Order Issued | Final Order With Penalty | Toxic Substances Control Act | $14,553 | 1 | echo.epa.gov |
EPA inspections and evaluations
Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.
| Date | Activity | Type | Law |
|---|---|---|---|
| March 12, 2024 | Inspection/Evaluation | PCB | Toxic Substances Control Act |
Also on SpecStream
Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.