Skip to the page

Data / Environmental compliance / Pennsylvania / Panther Creek Energy Facility

Panther Creek Energy Facility, PA: $80,050 in penalties

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 4 inspections, 4 informal enforcement actions and 1 formal enforcement action at Panther Creek Energy Facility, 4 Dennison Road, Nesquehoning, PA 18240, in the five years to November 1, 2026. Penalties total $80,050, the latest $80,050 on December 17, 2025. The facility had violations in 2 of the last 12 quarters.

The request: Get every facility in Electric Power Generation, Transmission and Distribution in Pennsylvania with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
4 Dennison Road, Nesquehoning, PA 18240
EPA registry ID (FRS)
110030471610
Industry
221112 Fossil Fuel Electric Power Generation
County
Carbon
Programs
Clean Air Act, Hazardous waste (RCRA)
Compliance status
No Violation Identified
Inspections
4, latest November 8, 2024
Formal actions
1, latest December 17, 2025
Informal actions
4, latest November 27, 2024
Penalties
$80,050 in 1 penalty
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Air Act441$80,050December 17, 2025$80,05020No Violation Identified
Hazardous waste (RCRA)000$0$000No Violation Identified

EPA inspections and evaluations

Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.

DateActivityTypeLaw
March 14, 2025Information RequestFormalResource Conservation and Recovery Act

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.