Skip to the page

Data / Environmental compliance / Alabama / George C Marshall Space Flight Center

George C Marshall Space Flight, AL: $8,800 in penalties

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 15 inspections, 3 informal enforcement actions and 2 formal enforcement actions at George C Marshall Space Flight Center, Building 4209, Redstone Arsenal, AL 35812, in the five years to November 1, 2026. Penalties total $8,800, the latest $8,800 on August 30, 2024. The facility was in significant noncompliance in 2 of the last 12 quarters.

The request: Get every facility in Aerospace Product and Parts Manufacturing in Alabama with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
Building 4209, Redstone Arsenal, AL 35812
EPA registry ID (FRS)
110000601947
Industry
336415 Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing; 92711 Space Research and Technology; 927110 Space Research and Technology
County
Madison
Programs
Clean Air Act, Clean Water Act, Hazardous waste (RCRA)
Compliance status
No Violation Identified
Inspections
15, latest September 30, 2026
Formal actions
2, latest April 29, 2026
Informal actions
3, latest April 11, 2024
Penalties
$8,800 in 1 penalty
ECHO facility report
echo.epa.gov

By program

Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.

ProgramInspectionsInformal actionsFormal actionsPenaltiesLatest penaltyLatest amountQuarters with violationsQuarters in significant noncomplianceStatus
Clean Air Act500$0$000No Violation Identified
Clean Water Act100$0$020No Violation Identified
Hazardous waste (RCRA)831$8,800August 30, 2024$8,80032No Violation Identified

EPA inspections and evaluations

Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.

DateActivityTypeLaw
May 4, 2023Inspection/EvaluationEvaluationResource Conservation and Recovery Act
February 16, 2023Inspection/EvaluationEvaluationToxic Substances Control Act

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.