Skip to the page

Data / Environmental compliance / Texas / City of Mabank, Water Treatment Plant

City of Mabank: 2 formal enforcement actions

Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).

EPA's ECHO database records 2 formal enforcement actions at City of Mabank, Water Treatment Plant, 2200 West Main Street, Gun Barrel City, TX 75147, in the five years to November 1, 2026. No penalty is recorded in that period.

The request: Get every facility in Water, Sewage and Other Systems in Texas with penalties and violations. $10 of work on sign-up, no card.

SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.

Site
2200 West Main Street, Gun Barrel City, TX 75147
EPA registry ID (FRS)
110000505365
Industry
22131 Water Supply and Irrigation Systems
County
Henderson
Programs
None recorded
Compliance status
Not recorded
Inspections
None in five years
Formal actions
2, latest January 27, 2026
Informal actions
None in five years
Penalties
None recorded in five years
ECHO facility report
echo.epa.gov

Federal enforcement cases

EPA cases that name this facility, newest first. The penalty is the whole case penalty, shared with the other facilities named in the case.

CaseCase nameStatus dateTypeStatusOutcomeStatutesCase penaltyFacilities in caseSource
06-2026-3516Mabank WTP-Gun Barrel City, TX-RMP ESA- FY 2026February 24, 2026Administrative, FormalClosedFinal Order No PenaltyClean Air Act$01echo.epa.gov
06-2022-1230City of Mabank (Drinking Water System)February 1, 2022Administrative, FormalClosedFinal Order No PenaltySafe Drinking Water Act$01echo.epa.gov

EPA inspections and evaluations

Compliance monitoring EPA itself carried out, newest first. State inspections are counted above, with the date of the latest.

DateActivityTypeLaw
December 18, 2025Inspection/EvaluationPCE Off-SiteClean Air Act

Also on SpecStream

Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.