Data / Environmental compliance / Washington / Boeing Plant 2
Boeing Plant 2, Tukwila, WA: $1,750 in penalties
Updated November 7, 2026. Source: US EPA, Enforcement and Compliance History Online (ECHO).
EPA's ECHO database records 11 inspections, 11 informal enforcement actions and 4 formal enforcement actions at Boeing Plant 2, 7755 E Marginal Way S, Tukwila, WA 98108, in the five years to November 1, 2026. Penalties total $1,750, the latest $1,000 on June 16, 2022. The facility was in significant noncompliance in 5 of the last 12 quarters.
The request: Get every facility in Nonmetallic Mineral Mining and Quarrying in Washington with penalties and violations. $10 of work on sign-up, no card.
SpecStream is the live web data engine for teams and agents. It reads EPA's enforcement and compliance records, and this page is that reading. Ask for the facilities you check by industry, state or program and new inspections, violations and penalties arrive in your sheet, CRM, Slack or agent as EPA and the states record them.
- Site
- 7755 E Marginal Way S, Tukwila, WA 98108
- EPA registry ID (FRS)
- 110017848105
- Industry
- 212319 Other Crushed and Broken Stone Mining and Quarrying; 336411 Aircraft Manufacturing; 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing; 488119 Other Airport Operations
- County
- King
- Programs
- Clean Air Act, Clean Water Act, Hazardous waste (RCRA)
- Compliance status
- Significant Violation
- Inspections
- 11, latest July 8, 2026
- Formal actions
- 4, latest June 8, 2026
- Informal actions
- 11, latest September 22, 2026
- Penalties
- $1,750 in 2 penalties
- ECHO facility report
- echo.epa.gov
By program
Inspections, enforcement actions and penalties of the last five years in each EPA program that covers the facility, as the program systems record them. Federal case penalties are listed under federal enforcement cases. Quarters count the last 12.
| Program | Inspections | Informal actions | Formal actions | Penalties | Latest penalty | Latest amount | Quarters with violations | Quarters in significant noncompliance | Status |
|---|---|---|---|---|---|---|---|---|---|
| Clean Air Act | 5 | 8 | 2 | $1,750 | June 16, 2022 | $1,000 | 0 | 0 | No Violation Identified |
| Clean Water Act | 4 | 0 | 2 | $0 | $0 | 12 | 5 | Failure to Report DMR, Not Received | |
| Hazardous waste (RCRA) | 2 | 3 | 0 | $0 | $0 | 2 | 0 | No Violation Identified |
EPA informal actions
Notices of violation and similar actions EPA itself took, newest first.
| Date | Action | Law | Identifier |
|---|---|---|---|
| January 17, 2023 | Notice of Violation | Resource Conservation and Recovery Act | 10-200219858 |
Also on SpecStream
- Environmental compliance in Nonmetallic Mineral Mining and Quarrying in Washington
- Environmental compliance in Washington
Public domain (U.S. government work). Counts and penalties cover the five years to November 1, 2026 as ECHO publishes them in its exporter and case downloads, drawn from EPA's air, water, hazardous waste and drinking water systems and from the states that report to them. Records can be incomplete, late or corrected after this page was read. A federal case penalty that names several facilities is shown on each of them and counted once in industry, state and national totals. Each row links to EPA's own report. A quarter in significant noncompliance is EPA's term for a serious violation status in a program, not a finding of fault beyond that status. This page uses US EPA data and is not endorsed or certified by the US EPA. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.