Skip to the page

Data / Federal rules / 2024-08720

Regulatory Guide: Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities

The Nuclear Regulatory Commission published this final rule in the Federal Register on April 25, 2024.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.30, "Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities." This RG describes an approach that is acceptable to the NRC staff to meet the regulatory requirements for installation, inspection, and testing for Class 1E power, instrumentation, and control equipment at production and utilization facilities.

Key facts

Document number
2024-08720
Type
Final rule
Action
Final guide; issuance
Agency
Nuclear Regulatory Commission
Published
April 25, 2024
Dates
Revision 1 to RG 1.30 is available on April 25, 2024.
Docket
NRC-2023-0216
Code of Federal Regulations
10 CFR 50; 10 CFR 52
Pages
2

The document on federalregister.gov PDF

Other documents from the Nuclear Regulatory Commission

Everything from the Nuclear Regulatory Commission · Published in April 2024

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.