Skip to the page

Data / Federal rules / 2024-02407

Regulatory Guide: Guidelines for Lightning Protection for Production and Utilization Facilities

The Nuclear Regulatory Commission published this final rule in the Federal Register on February 7, 2024.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG), 1.204, "Guidelines for Lightning Protection for Production and Utilization Facilities." This regulatory guide (RG) revision endorses, with clarifications and exceptions, the methods described in four Institute of Electrical and Electronics Engineers (IEEE) Standards (Std.). This revision also addresses one National Fire Protection Association standard and one Underwriters Laboratory standard as useful secondary references for demonstrating compliance with the applicable NRC regulations for adequate lightning protection of safety-related systems, structures, and components.

Key facts

Document number
2024-02407
Type
Final rule
Action
Final guide; issuance
Agency
Nuclear Regulatory Commission
Published
February 7, 2024
Dates
Revision 1 to RG 1.204 is available on February 7, 2024.
Docket
NRC-2023-0089
Code of Federal Regulations
10 CFR 50; 10 CFR 52
Pages
2

The document on federalregister.gov PDF

Other documents from the Nuclear Regulatory Commission

Everything from the Nuclear Regulatory Commission · Published in February 2024

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.