Skip to the page

Data / Federal rules / 2025-04650

List of Approved Spent Fuel Storage Casks: NAC International, Inc., MAGNASTOR® Storage System, Certificate of Compliance No. 1031, Amendment No. 15

The Nuclear Regulatory Commission published this proposed rule in the Federal Register on March 20, 2025. Comments closed on April 21, 2025.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage regulations by revising the NAC International, Inc. MAGNASTOR[supreg] Storage System listing within the "List of approved spent fuel storage casks" to include Amendment No. 15 to Certificate of Compliance No. 1031. Amendment No. 15 revises the certificate of compliance to add a new variation of the Lightweight MAGNASTOR[supreg] Transfer Cask design, add a new concrete cask design, increase the maximum system head load capacity, add new loading patterns, add a thermal shunt for short loading patterns, remove the 5 percent burnup penalty, increase Passive MAGNASTOR[supreg] Transfer Cask heat load, add two new pressurized-water reactor fuel types to support future operations, modify the transportable storage canister lid to allow additional clearance near the top center of the basket, and correct and clarify principal design criteria, operating procedures, and the acceptance criteria and maintenance program. This amendment also makes corresponding revisions to previously approved drawings for the concrete cask, Technical Specifications Appendix A and Appendix B, specific chapters of the final safety analysis report, and several license drawings.

Key facts

Document number
2025-04650
Type
Proposed rule
Action
Proposed rule
Agency
Nuclear Regulatory Commission
Published
March 20, 2025
Comments due
April 21, 2025
Dates
Submit comments by April 21, 2025. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date.
Docket
NRC-2024-0216
Regulation ID (RIN)
3150-AL25
Code of Federal Regulations
10 CFR 72
Pages
3

The document on federalregister.gov PDF

Other documents from the Nuclear Regulatory Commission

Everything from the Nuclear Regulatory Commission · Published in March 2025

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.