Skip to the page

Data / Federal rules / 2024-24814

Extension of Time-Limited Tolerances for Emergency Exemptions

The Environmental Protection Agency published this final rule in the Federal Register on October 25, 2024. It took effect on October 25, 2024.

SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.

What the agency says

This regulation extends time-limited tolerances for residues of the pesticides sodium salt of acifluorfen in or on Beet, sugar, roots and Beet, sugar, leaves; thiamethoxam in or on Rice, grain and Rice, straw; and clothianidin in or on Rice, grain. These actions are in response to EPA's granting of emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of these pesticides. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA.

Key facts

Document number
2024-24814
Type
Final rule
Action
Final rule
Agency
Environmental Protection Agency
Published
October 25, 2024
Takes effect
October 25, 2024
Dates
This regulation is effective October 25, 2024. Objections and requests for hearings must be received on or before December 24, 2024 and must be filed in accordance with the instructions provided in 40 CFR part 178 (see also Unit I.C. of the SUPPLEMENTARY INFORMATION).
Docket
EPA-HQ-OPP-2024-0413; FRL-12300-01-OCSPP
Code of Federal Regulations
40 CFR 180
Topics
Administrative practice and procedure; Agricultural commodities; Environmental protection; Pesticides and pests; Reporting and recordkeeping requirements
Pages
3

The document on federalregister.gov PDF

Other documents from the Environmental Protection Agency

Everything from the Environmental Protection Agency · Rules on administrative practice and procedure · Rules on agricultural commodities · Rules on environmental protection · Published in October 2024

Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.