Draft Regulatory Guide: Installation Design and Installation of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities
The Nuclear Regulatory Commission published this proposed rule in the Federal Register on January 8, 2024. Comments closed on February 7, 2024.
SpecStream is the live web data engine for teams and agents. It reads every rule and proposed rule in the Federal Register each morning, and this page is that reading. Name your industry once and new rules, comment deadlines and effective dates arrive in your sheet, CRM, Slack or agent as they are published.
What the agency says
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Regulatory Guide (DG), DG-1421, "Installation Design and Installation of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities." This DG is proposed Revision 3 of Regulatory Guide 1.128, "Installation Design and Installation of Vented Lead-Acid Storage Batteries for Nuclear Power Plants," and provides methods acceptable to the NRC to meet regulatory requirements for the installation design and installation of vented lead-acid storage batteries in production and utilization facilities. It endorses, with clarifications, the Institute of Electrical and Electronics Engineers (IEEE) Standard (Std.) 484-2019, "IEEE Recommended Practice for Installation Design and Installation of Vented Lead-Acid Batteries for Stationary Applications."
Key facts
- Document number
- 2024-00145
- Type
- Proposed rule
- Action
- Draft guide; request for comment
- Agency
- Nuclear Regulatory Commission
- Published
- January 8, 2024
- Comments due
- February 7, 2024
- Dates
- Submit comments by February 7, 2024. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date.
- Docket
- NRC-2024-0019
- Code of Federal Regulations
- 10 CFR 50; 10 CFR 52
- Pages
- 2
Other documents from the Nuclear Regulatory Commission
| Document | Type | Published |
|---|---|---|
| Irradiated Fuel Reprocessing Plants 2026-21690 | Proposed rule | Oct 23 |
| Fee Schedules; Fee Recovery for Fiscal Year 2026 C1-2026-12067 | Final rule | Oct 19 |
| AP1000 Design Certification Renewal 2026-21031 | Proposed rule | Oct 14 |
| AP1000 Design Certification Renewal 2026-21030 | Final rule | Oct 14 |
| Exemptions From Materials Licensing 2026-20336 | Final rule | Oct 5 |
| Exemptions From Materials Licensing 2026-20335 | Proposed rule | Oct 5 |
| State of Indiana: Discontinuance of Certain Commission Regulatory Authority Within the State, Notice of Agreement Between the Nuclear Regulatory Commission and the State of Indiana 2026-20276 | Final rule | Oct 2 |
| NRC Modernization: Rulemaking Procedure, Federal Advisory Committee Act Alignment, Access, and Security; Correction and Confirmation of Effective Date 2026-19963 | Final rule | Sep 30 |
Everything from the Nuclear Regulatory Commission · Published in January 2024
Read from the Federal Register API, last updated 2026-10-23. The document on federalregister.gov is the official record; dates and dockets can change through later corrections. Free to reuse with credit to SpecStream under CC BY 4.0.