Data / Workplace safety / Oregon / Whitewater Manufacturing Inc
Whitewater Manufacturing Inc, Merlin, OR: 23 OSHA citations, $5,085 in penalties (2022 to 2025)
OSHA recorded 3 inspections at Whitewater Manufacturing Inc, 724 Ort LN, Merlin, OR 97532, between March 24, 2022 and April 1, 2025. 2 inspections ended in citations: 23 citations with $10,815 in initial penalties and $5,085 in current penalties. The latest citation was issued July 29, 2022.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 724 Ort LN, Merlin, OR 97532
- Industry
- 336612 Boat Building
- Ownership
- Private
- Employees at the site
- 13 (as recorded at the latest inspection)
- Inspections
- 3, of which 2 with citations
- Citations
- 23
- Penalties
- $10,815 initial, $5,085 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| April 1, 2025 | April 1, 2025 | Planned | No inspection | Health | 0 | Not listed | osha.gov |
| May 31, 2022 | December 16, 2022 | Referral | Partial | Health | 3 | $320 | osha.gov |
| March 24, 2022 | September 11, 2026 | Planned | Complete | Safety | 20 | $4,765 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| May 31, 2022 | 1910.106(e)(2)(ii) | Flammable liquids | Serious | Not listed | July 29, 2022 | $100 | $100 | osha.gov |
| May 31, 2022 | 1910.106(e)(9)(iii) | Flammable liquids | Serious | Not listed | July 29, 2022 | $120 | $120 | osha.gov |
| May 31, 2022 | OAR 437-001-0760(1)(C)-1 | Serious | Not listed | July 29, 2022 | $100 | $100 | osha.gov | |
| March 24, 2022 | OAR 437-002-0221(4)(A) | Other than serious | Not listed | June 29, 2022 | $0 | $0 | osha.gov | |
| March 24, 2022 | OAR 437-002-0161(2)(A)-1 | Other than serious | Not listed | June 29, 2022 | $0 | $0 | osha.gov | |
| March 24, 2022 | OAR 437-002-0041(8)(H) | Other than serious | Not listed | June 29, 2022 | $0 | $0 | osha.gov | |
| March 24, 2022 | OAR 437-002-0378(4)(A) | Other than serious | Not listed | June 29, 2022 | $0 | $0 | osha.gov | |
| March 24, 2022 | OAR 437-001-0700(14)(A)-2 | Other than serious | Not listed | June 29, 2022 | $100 | $100 | osha.gov | |
| March 24, 2022 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov |
| March 24, 2022 | 1910.305(a)(2)(ix) | Wiring methods, components, and equipment for general use | Serious | Not listed | June 29, 2022 | $180 | $180 | osha.gov |
| March 24, 2022 | OAR 437-001-0765(1) | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov | |
| March 24, 2022 | OAR 437-002-0187(1)-6 | Serious | Not listed | June 29, 2022 | $0 | $0 | osha.gov | |
| March 24, 2022 | OAR 437-002-0187(2)-2 | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov | |
| March 24, 2022 | 1910.219(e)(3)(i) | Mechanical power-transmission apparatus | Serious | Not listed | June 29, 2022 | $180 | $180 | osha.gov |
| March 24, 2022 | 1910.212(a)(1) | General requirements for all machines | Serious | Not listed | June 29, 2022 | $180 | $180 | osha.gov |
| March 24, 2022 | 1910.215(a)(4) | Abrasive wheel machinery | Serious | Not listed | June 29, 2022 | $180 | $180 | osha.gov |
| March 24, 2022 | 1910.242(b) | Hand and portable powered tools and equipment, general | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov |
| March 24, 2022 | 1910.334(a)(2)(i) | Use of equipment | Serious | Not listed | June 29, 2022 | $375 | $375 | osha.gov |
| March 24, 2022 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov |
| March 24, 2022 | 1910.304(f)(1)(viii) | Wiring design and protection | Serious | Not listed | June 29, 2022 | $450 | $450 | osha.gov |
| March 24, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | Not listed | June 29, 2022 | $450 | $270 | osha.gov |
| March 24, 2022 | 1910.333(a)(1) | Selection and use of work practices | Serious | Not listed | June 29, 2022 | $2,250 | $300 | osha.gov |
| March 24, 2022 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Serious | Not listed | June 29, 2022 | $3,900 | $300 | osha.gov |
Also on SpecStream
- All OSHA citations in Ship and Boat Building in Oregon
- OSHA citations in Oregon
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.106, Flammable liquids: all citations
- 29 CFR 1910.333, Selection and use of work practices: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.