Skip to the page

Data / Workplace safety / Connecticut / Town of Vernon

Town of Vernon, Vernon, CT: 15 OSHA citations, $1,376 in penalties (2025)

OSHA recorded 1 inspection at Town of Vernon, Water Pollution Control Treatment Plant 100 Windsorville Road, P.o. Box 22, Vernon, CT 06066, on January 22, 2025. 1 inspection ended in citations: 15 citations with $3,440 in initial penalties and $1,376 in current penalties. The latest citation was issued March 11, 2025.

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

Site
Water Pollution Control Treatment Plant 100 Windsorville Road, P.o. Box 22, Vernon, CT 06066
Industry
221320 Sewage Treatment Facilities
Ownership
Local government
Employees at the site
12 (as recorded at the latest inspection)
Inspections
1, of which 1 with citations
Citations
15
Penalties
$3,440 initial, $1,376 current

Inspections

Every inspection OSHA opened at this site since November 3, 2021.

OpenedClosedTypeScopeFocusCitationsCurrent penaltiesSource
January 22, 2025June 12, 2025PlannedCompleteSafety15$1,376osha.gov

Citations

One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.

Inspection openedStandard citedStandard titleTypeGravityIssuedInitial penaltyCurrent penaltySource
January 22, 20251910.1450(e)(4)Occupational exposure to hazardous chemicals in laboratoriesOther than serious5March 11, 2025$0$0osha.gov
January 22, 20251910.22(a)(3)General requirementsOther than serious5March 11, 2025$0$0osha.gov
January 22, 20251910.1200(h)(1)Hazard communicationSerious6March 11, 2025$0$0osha.gov
January 22, 20251910.1200(e)(1)Hazard communicationSerious6March 11, 2025$480$192osha.gov
January 22, 20251910.303(g)(1)(ii)GeneralSerious6March 11, 2025$480$192osha.gov
January 22, 20251910.212(b)General requirements for all machinesSerious7March 11, 2025$0$0osha.gov
January 22, 20251910.212(a)(1)General requirements for all machinesSerious7March 11, 2025$560$224osha.gov
January 22, 20251910.184(e)(4)SlingsSerious5March 11, 2025$0$0osha.gov
January 22, 20251910.184(e)(3)(i)SlingsSerious5March 11, 2025$400$160osha.gov
January 22, 20251910.146(c)(2)Permit-required confined spacesSerious7March 11, 2025$0$0osha.gov
January 22, 20251910.146(c)(1)Permit-required confined spacesSerious8March 11, 2025$640$256osha.gov
January 22, 20251910.36(h)(2)Design and construction requirements for exit routesSerious6March 11, 2025$0$0osha.gov
January 22, 20251910.36(c)(3)Design and construction requirements for exit routesSerious6March 11, 2025$480$192osha.gov
January 22, 20251910.29(e)(2)Fall protection systems and falling object protection, criteria and practicesSerious6March 11, 2025$0$0osha.gov
January 22, 20251910.28(b)(3)(ii)Duty to have fall protection and falling object protectionSerious5March 11, 2025$400$160osha.gov

Also on SpecStream

Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.