Data / Workplace safety / Tennessee / Shelbyville Power, Water & Sewerage System - Electric Department
Shelbyville Power, Water & Sewerage System - Electric Department, Shelbyville, TN: 6 OSHA citations, $0 in penalties (2022 to 2025)
OSHA recorded 2 inspections at Shelbyville Power, Water & Sewerage System - Electric Department, 308 South Main Street, Shelbyville, TN 37162, between February 10, 2022 and November 6, 2025. 2 inspections ended in citations: 6 citations with $0 in initial penalties and $0 in current penalties. The latest citation was issued November 13, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 308 South Main Street, Shelbyville, TN 37162
- Industry
- 221122 Electric Power Distribution
- Ownership
- Local government
- Employees at the site
- 18 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 6
- Penalties
- $0 initial, $0 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| November 6, 2025 | November 20, 2025 | Planned | Complete | Safety | 1 | $0 | osha.gov |
| February 10, 2022 | March 16, 2022 | Planned | Complete | Safety | 5 | $0 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| November 6, 2025 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 4 | November 13, 2025 | $0 | $0 | osha.gov |
| February 10, 2022 | TDLWD RULE 800-01-09-.06(2) | Serious | 5 | February 23, 2022 | $0 | $0 | osha.gov | |
| February 10, 2022 | 1910.334(a)(2)(i) | Use of equipment | Serious | 4 | February 23, 2022 | $0 | $0 | osha.gov |
| February 10, 2022 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Serious | 4 | February 23, 2022 | $0 | $0 | osha.gov |
| February 10, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 4 | February 23, 2022 | $0 | $0 | osha.gov |
| February 10, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 4 | February 23, 2022 | $0 | $0 | osha.gov |
Also on SpecStream
- All OSHA citations in Electric Power Generation, Transmission and Distribution in Tennessee
- OSHA citations in Tennessee
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.334, Use of equipment: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.