Data / Workplace safety / Maryland / RM Cruz Construction Services, LLC
RM Cruz Construction Services, LLC, Baltimore, MD: 28 OSHA citations, $69,250 in penalties (2025)
OSHA recorded 1 inspection at RM Cruz Construction Services, LLC, 113-123 East Cromwell Street, Baltimore, MD 21230, on June 5, 2025. 1 inspection ended in citations: 28 citations with $69,250 in initial penalties and $69,250 in current penalties. The latest citation was issued September 29, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 113-123 East Cromwell Street, Baltimore, MD 21230
- Industry
- 238130 Framing Contractors
- Ownership
- Private
- Employees at the site
- 15 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 28
- Penalties
- $69,250 initial, $69,250 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| June 5, 2025 | Planned | Complete | Safety | 28 | $69,250 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| June 5, 2025 | 1926.503(b)(1) | Training requirements | Repeat | 1 | September 29, 2025 | $4,500 | $4,500 | osha.gov |
| June 5, 2025 | 1910.1200(h)(1) | Hazard communication | Repeat | 1 | September 29, 2025 | $4,500 | $4,500 | osha.gov |
| June 5, 2025 | 1910.1200(g)(1) | Hazard communication | Repeat | 1 | September 29, 2025 | $4,500 | $4,500 | osha.gov |
| June 5, 2025 | 1910.1200(e)(1)(i) | Hazard communication | Repeat | 1 | September 29, 2025 | $4,500 | $4,500 | osha.gov |
| June 5, 2025 | 1910.1200(e)(1) | Hazard communication | Repeat | 1 | September 29, 2025 | $4,500 | $4,500 | osha.gov |
| June 5, 2025 | 1910.178(l)(6) | Powered industrial trucks | Repeat | 5 | September 29, 2025 | $1,000 | $1,000 | osha.gov |
| June 5, 2025 | 1926.1053(b)(15) | Ladders | Other than serious | 1 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.1053(b)(13) | Ladders | Other than serious | 5 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.300(a) | General requirements | Other than serious | 1 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.150(a)(4) | Fire protection | Other than serious | 5 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.25(a) | Housekeeping | Other than serious | 1 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.503(a)(1) | Training requirements | Repeat | 7 | September 29, 2025 | $7,000 | $7,000 | osha.gov |
| June 5, 2025 | 1926.501(b)(13) | Duty to have fall protection | Repeat | 7 | September 29, 2025 | $10,500 | $10,500 | osha.gov |
| June 5, 2025 | 1926.302(b)(3) | Power-operated hand tools | Repeat | 7 | September 29, 2025 | $3,500 | $3,500 | osha.gov |
| June 5, 2025 | 1926.102(a)(1) | Eye and face protection | Repeat | 5 | September 29, 2025 | $7,500 | $7,500 | osha.gov |
| June 5, 2025 | 1926.20(b)(2) | General safety and health provisions | Repeat | 6 | September 29, 2025 | $3,000 | $3,000 | osha.gov |
| June 5, 2025 | 1926.20(b)(1) | General safety and health provisions | Repeat | 7 | September 29, 2025 | $3,500 | $3,500 | osha.gov |
| June 5, 2025 | 1910.178(l)(1)(i) | Powered industrial trucks | Repeat | 5 | September 29, 2025 | $2,500 | $2,500 | osha.gov |
| June 5, 2025 | 05-104(A) | Serious | 5 | September 29, 2025 | $1,250 | $1,250 | osha.gov | |
| June 5, 2025 | 1926.1053(b)(16) | Ladders | Serious | 7 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.1053(b)(1) | Ladders | Serious | 7 | September 29, 2025 | $1,750 | $1,750 | osha.gov |
| June 5, 2025 | 1926.416(e)(1) | General requirements | Serious | 7 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.405(g)(2)(iv) | Wiring methods, components, and equipment for general use | Serious | 7 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.404(f)(6) | Wiring design and protection | Serious | 7 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.403(b)(2) | General requirements | Serious | 7 | September 29, 2025 | $0 | $0 | osha.gov |
| June 5, 2025 | 1926.403(b)(1) | General requirements | Serious | 7 | September 29, 2025 | $1,750 | $1,750 | osha.gov |
| June 5, 2025 | 1926.300(b)(2) | General requirements | Serious | 7 | September 29, 2025 | $1,750 | $1,750 | osha.gov |
| June 5, 2025 | 1926.21(b)(2) | Safety training and education | Serious | 7 | September 29, 2025 | $1,750 | $1,750 | osha.gov |
Also on SpecStream
- All OSHA citations in Foundation, Structure, and Building Exterior Contractors in Maryland
- OSHA citations in Maryland
- 29 CFR 1926.1053, Ladders: all citations
- 29 CFR 1910.1200, Hazard communication: all citations
- 29 CFR 1926.300, General requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.