Regal Ware, Inc., West Bend, WI: 29 OSHA citations, $106,117 in penalties (2022 to 2025)
OSHA recorded 7 inspections at Regal Ware, Inc., 1100 Schmidt Road, West Bend, WI 53090, between July 7, 2022 and December 19, 2025. 7 inspections ended in citations: 29 citations with $168,835 in initial penalties and $106,117 in current penalties. The latest citation was issued February 12, 2026.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 1100 Schmidt Road, West Bend, WI 53090
- Industry
- 335210 Small Electrical Appliance Manufacturing
- Ownership
- Private
- Employees at the site
- 200 (as recorded at the latest inspection)
- Inspections
- 7, of which 7 with citations
- Citations
- 29
- Penalties
- $168,835 initial, $106,117 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| December 19, 2025 | July 30, 2026 | Complaint | Partial | Health | 1 | $5,427 | osha.gov |
| March 25, 2025 | April 27, 2026 | Complaint | Partial | Safety | 14 | $25,000 | osha.gov |
| January 24, 2025 | October 1, 2026 | Complaint | Partial | Health | 1 | $3,500 | osha.gov |
| November 7, 2024 | Referral | Partial | Safety | 3 | $16,384 | osha.gov | |
| April 16, 2024 | February 14, 2025 | Referral | Partial | Safety | 1 | $6,500 | osha.gov |
| July 8, 2022 | September 30, 2022 | Referral | Records only | Safety | 1 | $1,450 | osha.gov |
| July 7, 2022 | December 12, 2023 | Complaint | Partial | Safety | 8 | $47,856 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| December 19, 2025 | 1910.95(i)(4) | Occupational noise exposure | Serious | 5 | February 12, 2026 | $10,854 | $5,427 | osha.gov |
| March 25, 2025 | 1910.146(j)(1) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(i)(1) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(h)(1) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(g)(1) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $10,641 | $10,641 | osha.gov |
| March 25, 2025 | 1910.146(e)(1) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(5)(ii) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(5)(i) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $10,641 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3)(vi) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3)(iv) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3)(iii) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3)(ii) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3)(i) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $0 | $0 | osha.gov |
| March 25, 2025 | 1910.146(d)(3) | Permit-required confined spaces | Serious | 5 | August 20, 2025 | $10,641 | $10,641 | osha.gov |
| March 25, 2025 | 1910.146(c)(4) | Permit-required confined spaces | Other than serious | 5 | August 20, 2025 | $10,641 | $3,718 | osha.gov |
| January 24, 2025 | 1910.132(d)(1)(i) | General requirements | Serious | 1 | June 6, 2025 | $5,969 | $3,500 | osha.gov |
| November 7, 2024 | 1910.212(a)(1) | General requirements for all machines | Serious | 10 | April 7, 2025 | $14,895 | $8,192 | osha.gov |
| November 7, 2024 | 1910.147(d)(2) | The control of hazardous energy (lockout/tagout) | Serious | 10 | April 7, 2025 | $0 | $0 | osha.gov |
| November 7, 2024 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | April 7, 2025 | $14,895 | $8,192 | osha.gov |
| April 16, 2024 | 1910.215(a)(4) | Abrasive wheel machinery | Serious | 5 | September 12, 2024 | $9,218 | $6,500 | osha.gov |
| July 7, 2022 | 1910.212(a)(3)(ii) | General requirements for all machines | Serious | 5 | December 2, 2022 | $10,360 | $7,252 | osha.gov |
| July 7, 2022 | 1910.212(a)(1) | General requirements for all machines | Serious | 5 | December 2, 2022 | $0 | $0 | osha.gov |
| July 7, 2022 | 1910.147(d) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 2, 2022 | $14,502 | $10,151 | osha.gov |
| July 7, 2022 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 2, 2022 | $0 | $0 | osha.gov |
| July 7, 2022 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 2, 2022 | $14,502 | $10,151 | osha.gov |
| July 7, 2022 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 2, 2022 | $14,502 | $10,151 | osha.gov |
| July 7, 2022 | 1910.217(d)(9)(i) | Mechanical power presses | Serious | 10 | December 2, 2022 | $0 | $0 | osha.gov |
| July 7, 2022 | 1910.147(c)(4)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 10 | December 2, 2022 | $14,502 | $10,151 | osha.gov |
| July 8, 2022 | 1904.41(a)(1) | Electronic submission of Employer Identification Number (EIN) and injury and illness records to OSHA | Other than serious | Not listed | August 25, 2022 | $2,072 | $1,450 | osha.gov |
Also on SpecStream
- OSHA citations in Wisconsin
- 29 CFR 1910.146, Permit-required confined spaces: all citations
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.