Data / Workplace safety / Kentucky / Rector Excavating Inc
Rector Excavating Inc, Wilder, KY: 6 OSHA citations, $23,520 in penalties (2025)
OSHA recorded 1 inspection at Rector Excavating Inc, 158 Valley View DR, Wilder, KY 41071, on July 15, 2025. 1 inspection ended in citations: 6 citations with $33,600 in initial penalties and $23,520 in current penalties. The latest citation was issued December 19, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 158 Valley View DR, Wilder, KY 41071
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 6 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 6
- Penalties
- $33,600 initial, $23,520 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| July 15, 2025 | Referral | Partial | Safety | 6 | $23,520 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| July 15, 2025 | 1926.652(a)(1) | Requirements for protective systems | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
| July 15, 2025 | 1926.651(k)(1) | Specific excavation requirements | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
| July 15, 2025 | 1926.651(j)(2) | Specific excavation requirements | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
| July 15, 2025 | 1926.651(c)(2) | Specific excavation requirements | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
| July 15, 2025 | 1926.651(b)(4) | Specific excavation requirements | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
| July 15, 2025 | 1926.300(b)(1) | General requirements | Serious | Not listed | December 19, 2025 | $5,600 | $3,920 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Kentucky
- OSHA citations in Kentucky
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.300, General requirements: all citations
- 29 CFR 1926.652, Requirements for protective systems: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.