Data / Workplace safety / Ohio / Plastilene Inc
Plastilene Inc, Washington Court House, OH: 6 OSHA citations, $13,724 in penalties (2025 to 2026)
OSHA recorded 2 inspections at Plastilene Inc, 1010 Mead ST., Washington Court House, OH 43160, between April 3, 2025 and May 5, 2026. 1 inspection ended in citations: 6 citations with $36,493 in initial penalties and $13,724 in current penalties. The latest citation was issued July 25, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 1010 Mead ST., Washington Court House, OH 43160
- Industry
- 322211 Corrugated and Solid Fiber Box Manufacturing
- Ownership
- Private
- Employees at the site
- 35 (as recorded at the latest inspection)
- Inspections
- 2, of which 1 with citations
- Citations
- 6
- Penalties
- $36,493 initial, $13,724 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| May 5, 2026 | Follow-up | Partial | Safety | 0 | Not listed | osha.gov | |
| April 3, 2025 | September 23, 2026 | Complaint | Partial | Safety | 6 | $13,724 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| April 3, 2025 | 1904.32(b)(6) | Annual summary | Other than serious | Not listed | July 25, 2025 | $1,324 | $500 | osha.gov |
| April 3, 2025 | 1903.2(a)(1) | Posting of notice; availability of the Act, regulations and applicable standards | Other than serious | Not listed | July 25, 2025 | $744 | $250 | osha.gov |
| April 3, 2025 | 1910.212(a)(1) | General requirements for all machines | Serious | 10 | July 25, 2025 | $9,268 | $6,487 | osha.gov |
| April 3, 2025 | 1910.147(d) | The control of hazardous energy (lockout/tagout) | Serious | 5 | July 25, 2025 | $6,621 | $0 | osha.gov |
| April 3, 2025 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | July 25, 2025 | $9,268 | $0 | osha.gov |
| April 3, 2025 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | July 25, 2025 | $9,268 | $6,487 | osha.gov |
Also on SpecStream
- All OSHA citations in Converted Paper Product Manufacturing in Ohio
- OSHA citations in Ohio
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
- 29 CFR 1903.2, Posting of notice; availability of the Act, regulations and applicable standards: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.