Data / Workplace safety / Illinois / Mead Contracting, LLC
Mead Contracting, LLC, New Lenox, IL: 8 OSHA citations, $12,182 in penalties (2025)
OSHA recorded 1 inspection at Mead Contracting, LLC, 2162-2168 Sky Harbor DR., New Lenox, IL 60451, on April 24, 2025. 1 inspection ended in citations: 8 citations with $37,930 in initial penalties and $12,182 in current penalties. The latest citation was issued April 10, 2026.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 2162-2168 Sky Harbor DR., New Lenox, IL 60451
- Industry
- 238130 Framing Contractors
- Ownership
- Private
- Employees at the site
- 5 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 8
- Penalties
- $37,930 initial, $12,182 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| April 24, 2025 | Planned | Partial | Safety | 8 | $12,182 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| April 24, 2025 | 1903.19(c)(1) | Abatement verification | Other than serious | Not listed | April 10, 2026 | $478 | $478 | osha.gov |
| April 24, 2025 | 1926.501(b)(13) | Duty to have fall protection | Repeat | 5 | May 23, 2025 | $9,363 | $4,718 | osha.gov |
| April 24, 2025 | 1910.178(l)(6) | Powered industrial trucks | Other than serious | 10 | May 23, 2025 | $10,923 | $0 | osha.gov |
| April 24, 2025 | 1926.602(c)(1)(ii) | Material handling equipment | Serious | 10 | May 23, 2025 | $5,462 | $2,713 | osha.gov |
| April 24, 2025 | 1926.503(b)(1) | Training requirements | Other than serious | 5 | May 23, 2025 | $3,121 | $0 | osha.gov |
| April 24, 2025 | 1926.251(a)(6) | Rigging equipment for material handling | Serious | 5 | May 23, 2025 | $0 | $0 | osha.gov |
| April 24, 2025 | 1926.251(a)(2)(iii) | Rigging equipment for material handling | Serious | 10 | May 23, 2025 | $5,462 | $2,713 | osha.gov |
| April 24, 2025 | 1926.100(a) | Head protection | Serious | 5 | May 23, 2025 | $3,121 | $1,561 | osha.gov |
Also on SpecStream
- All OSHA citations in Foundation, Structure, and Building Exterior Contractors in Illinois
- OSHA citations in Illinois
- 29 CFR 1926.251, Rigging equipment for material handling: all citations
- 29 CFR 1926.100, Head protection: all citations
- 29 CFR 1926.503, Training requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.