Data / Workplace safety / North Carolina / Mccreary Modern, Inc.
Mccreary Modern, Inc., Lenoir, NC: 20 OSHA citations, $14,880 in penalties (2025)
OSHA recorded 2 inspections at Mccreary Modern, Inc., 2961 Rocky Road, Lenoir, NC 28645, between January 8, 2025 and August 6, 2025. 1 inspection ended in citations: 20 citations with $22,750 in initial penalties and $14,880 in current penalties. The latest citation was issued June 11, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 2961 Rocky Road, Lenoir, NC 28645
- Industry
- 337122 Nonupholstered Wood Household Furniture Manufacturing
- Ownership
- Private
- Employees at the site
- 100 (as recorded at the latest inspection)
- Inspections
- 2, of which 1 with citations
- Citations
- 20
- Penalties
- $22,750 initial, $14,880 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| August 6, 2025 | August 12, 2025 | Follow-up | Complete | Health | 0 | Not listed | osha.gov |
| January 8, 2025 | July 24, 2025 | Planned | Complete | Health | 20 | $14,880 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| January 8, 2025 | 1910.334(a)(2)(ii) | Use of equipment | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.334(a)(2)(i) | Use of equipment | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.305(a)(2)(x) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.219(c)(4)(i) | Mechanical power-transmission apparatus | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.147(c)(6)(ii) | The control of hazardous energy (lockout/tagout) | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.146(c)(2) | Permit-required confined spaces | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.110(h)(12) | Storage and handling of liquefied petroleum gases | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.107(g)(2) | Spray finishing using flammable and combustible materials | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.95(l)(1) | Occupational noise exposure | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.37(b)(6) | Maintenance, safeguards, and operational features for exit routes | Other than serious | Not listed | June 11, 2025 | $0 | $0 | osha.gov |
| January 8, 2025 | 1910.213(l)(2) | Woodworking machinery requirements | Serious | Not listed | June 11, 2025 | $4,225 | $2,760 | osha.gov |
| January 8, 2025 | 1910.213(d)(1) | Woodworking machinery requirements | Serious | Not listed | June 11, 2025 | $1,950 | $1,275 | osha.gov |
| January 8, 2025 | 1910.213(b)(6) | Woodworking machinery requirements | Serious | Not listed | June 11, 2025 | $1,950 | $1,275 | osha.gov |
| January 8, 2025 | 1910.213(a)(9) | Woodworking machinery requirements | Serious | Not listed | June 11, 2025 | $6,500 | $4,260 | osha.gov |
| January 8, 2025 | 1910.212(b) | General requirements for all machines | Serious | Not listed | June 11, 2025 | $1,950 | $1,275 | osha.gov |
| January 8, 2025 | 1910.212(a)(1) | General requirements for all machines | Serious | Not listed | June 11, 2025 | $4,225 | $2,760 | osha.gov |
| January 8, 2025 | 1910.29(b)(2) | Fall protection systems and falling object protection, criteria and practices | Serious | Not listed | June 11, 2025 | $1,950 | $1,275 | osha.gov |
Also on SpecStream
- All OSHA citations in Household and Institutional Furniture and Kitchen Cabinet Manufacturing in North Carolina
- OSHA citations in North Carolina
- 29 CFR 1910.213, Woodworking machinery requirements: all citations
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.