Data / Workplace safety / Illinois / Mauro Sewer Construction, Inc.
Mauro Sewer Construction, Inc., Wilmette, IL: 4 OSHA citations, $89,000 in penalties (2024)
OSHA recorded 1 inspection at Mauro Sewer Construction, Inc., 610 4TH Street, Wilmette, IL 60091, on October 29, 2024. 1 inspection ended in citations: 4 citations with $124,843 in initial penalties and $89,000 in current penalties. The latest citation was issued March 14, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 610 4TH Street, Wilmette, IL 60091
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 21 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 4
- Penalties
- $124,843 initial, $89,000 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| October 29, 2024 | Planned | Partial | Safety | 4 | $89,000 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| October 29, 2024 | 1926.652(c)(3)(iii) | Requirements for protective systems | Other than serious | Not listed | March 14, 2025 | $2,080 | $8,000 | osha.gov |
| October 29, 2024 | 1926.652(a)(1) | Requirements for protective systems | Repeat | 10 | March 13, 2025 | $109,239 | $65,000 | osha.gov |
| October 29, 2024 | 1926.652(d)(2) | Requirements for protective systems | Serious | 10 | March 13, 2025 | $7,282 | $8,000 | osha.gov |
| October 29, 2024 | 1926.651(i)(3) | Specific excavation requirements | Serious | 5 | March 13, 2025 | $6,242 | $8,000 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Illinois
- OSHA citations in Illinois
- 29 CFR 1926.652, Requirements for protective systems: all citations
- 29 CFR 1926.651, Specific excavation requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.