Data / Workplace safety / Illinois / Marquez Construction Restoration Corp.
Marquez Construction Restoration Corp., Cicero, IL: 9 OSHA citations, $9,612 in penalties (2023)
OSHA recorded 2 inspections at Marquez Construction Restoration Corp., 5950 Ogden Ave,, Cicero, IL 60804, on March 30, 2023. 2 inspections ended in citations: 9 citations with $18,165 in initial penalties and $9,612 in current penalties. The latest citation was issued August 28, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 5950 Ogden Ave,, Cicero, IL 60804
- Industry
- 236220 Commercial and Institutional Building Construction
- Ownership
- Private
- Employees at the site
- 2 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 9
- Penalties
- $18,165 initial, $9,612 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| March 30, 2023 | March 10, 2026 | Programmed related | Partial | Health | 3 | $3,876 | osha.gov |
| March 30, 2023 | Planned | Partial | Safety | 6 | $5,736 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| March 30, 2023 | 1903.19(c)(1) | Abatement verification | Other than serious | Not listed | August 28, 2023 | $376 | $376 | osha.gov |
| March 30, 2023 | 1903.19(c)(1) | Abatement verification | Other than serious | Not listed | August 28, 2023 | $376 | $376 | osha.gov |
| March 30, 2023 | 1926.1153(e)(2) | Respirable crystalline silica | Serious | 5 | June 1, 2023 | $3,349 | $1,750 | osha.gov |
| March 30, 2023 | 1926.1153(c)(1) | Respirable crystalline silica | Serious | 5 | June 1, 2023 | $3,349 | $1,750 | osha.gov |
| March 30, 2023 | 1926.454(a) | Training requirements | Serious | 5 | June 1, 2023 | $0 | $0 | osha.gov |
| March 30, 2023 | 1926.451(g)(4)(i) | General requirements | Serious | 5 | June 1, 2023 | $4,018 | $2,010 | osha.gov |
| March 30, 2023 | 1926.451(e)(1) | General requirements | Serious | 5 | June 1, 2023 | $0 | $0 | osha.gov |
| March 30, 2023 | 1926.451(c)(2) | General requirements | Serious | 5 | June 1, 2023 | $2,679 | $1,340 | osha.gov |
| March 30, 2023 | 1926.451(b)(1) | General requirements | Serious | 5 | June 1, 2023 | $4,018 | $2,010 | osha.gov |
Also on SpecStream
- All OSHA citations in Nonresidential Building Construction in Illinois
- OSHA citations in Illinois
- 29 CFR 1926.451, General requirements: all citations
- 29 CFR 1926.1153, Respirable crystalline silica: all citations
- 29 CFR 1903.19, Abatement verification: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.