Data / Workplace safety / South Carolina / Knights Precast LLC Summerville
Knights Precast LLC Summerville, Summerville, SC: 19 OSHA citations, $14,749 in penalties (2025 to 2026)
OSHA recorded 2 inspections at Knights Precast LLC Summerville, 480 Hodge Road, Summerville, SC 29483, between June 9, 2025 and January 7, 2026. 2 inspections ended in citations: 19 citations with $22,700 in initial penalties and $14,749 in current penalties. The latest citation was issued May 20, 2026.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 480 Hodge Road, Summerville, SC 29483
- Industry
- 327390 Other Concrete Product Manufacturing
- Ownership
- Private
- Employees at the site
- 150 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 19
- Penalties
- $22,700 initial, $14,749 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| January 7, 2026 | Referral | Partial | Health | 7 | $5,993 | osha.gov | |
| June 9, 2025 | June 1, 2026 | Planned | Complete | Safety | 12 | $8,756 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| January 7, 2026 | 1910.134(k)(6) | Respiratory protection | Other than serious | Not listed | May 20, 2026 | $650 | $422 | osha.gov |
| January 7, 2026 | 1910.1200(h)(1) | Hazard communication | Serious | Not listed | May 20, 2026 | $0 | $0 | osha.gov |
| January 7, 2026 | 1910.1200(e)(1)(i) | Hazard communication | Serious | Not listed | May 20, 2026 | $0 | $0 | osha.gov |
| January 7, 2026 | 1910.1200(e)(1) | Hazard communication | Serious | Not listed | May 20, 2026 | $2,275 | $1,478 | osha.gov |
| January 7, 2026 | 1910.1053(f)(2)(i) | Respirable crystalline silica | Serious | Not listed | May 20, 2026 | $2,275 | $1,478 | osha.gov |
| January 7, 2026 | 1910.1053(d)(6)(i) | Respirable crystalline silica | Serious | Not listed | May 20, 2026 | $2,275 | $1,478 | osha.gov |
| January 7, 2026 | 1910.1053(d)(3)(i) | Respirable crystalline silica | Serious | Not listed | May 20, 2026 | $1,750 | $1,137 | osha.gov |
| June 9, 2025 | 1910.334(a)(2)(i) | Use of equipment | Other than serious | Not listed | December 4, 2025 | $350 | $227 | osha.gov |
| June 9, 2025 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | December 4, 2025 | $350 | $227 | osha.gov |
| June 9, 2025 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | December 4, 2025 | $350 | $227 | osha.gov |
| June 9, 2025 | 1910.157(e)(3) | Portable fire extinguishers | Other than serious | Not listed | December 4, 2025 | $350 | $227 | osha.gov |
| June 9, 2025 | 1910.157(e)(2) | Portable fire extinguishers | Other than serious | Not listed | December 4, 2025 | $200 | $130 | osha.gov |
| June 9, 2025 | 1910.303(f)(2) | General | Serious | Not listed | December 4, 2025 | $2,500 | $1,625 | osha.gov |
| June 9, 2025 | 1910.243(c)(3) | Guarding of portable powered tools | Serious | Not listed | December 4, 2025 | $875 | $568 | osha.gov |
| June 9, 2025 | 1910.215(b)(9) | Abrasive wheel machinery | Serious | Not listed | December 4, 2025 | $500 | $325 | osha.gov |
| June 9, 2025 | 1910.212(a)(5) | General requirements for all machines | Serious | Not listed | December 4, 2025 | $500 | $325 | osha.gov |
| June 9, 2025 | 1910.212(a)(2) | General requirements for all machines | Serious | Not listed | December 4, 2025 | $2,500 | $1,625 | osha.gov |
| June 9, 2025 | 1910.212(a)(1) | General requirements for all machines | Serious | Not listed | December 4, 2025 | $2,500 | $1,625 | osha.gov |
| June 9, 2025 | 1910.179(l)(3)(iii) | Overhead and gantry cranes | Serious | Not listed | December 4, 2025 | $2,500 | $1,625 | osha.gov |
Also on SpecStream
- All OSHA citations in Cement and Concrete Product Manufacturing in South Carolina
- OSHA citations in South Carolina
- 29 CFR 1910.1053, Respirable crystalline silica: all citations
- 29 CFR 1910.1200, Hazard communication: all citations
- 29 CFR 1910.212, General requirements for all machines: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.