Data / Workplace safety / Texas / Knight Erosion Control, Inc.
Knight Erosion Control, Inc., Frisco, TX: 5 OSHA citations, $29,584 in penalties (2022)
OSHA recorded 1 inspection at Knight Erosion Control, Inc., 3495 Shaddock Creek, Frisco, TX 75034, on March 14, 2022. 1 inspection ended in citations: 5 citations with $49,306 in initial penalties and $29,584 in current penalties. The latest citation was issued July 21, 2022.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 3495 Shaddock Creek, Frisco, TX 75034
- Industry
- 237990 Other Heavy and Civil Engineering Construction
- Ownership
- Private
- Employees at the site
- 41 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 5
- Penalties
- $49,306 initial, $29,584 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| March 14, 2022 | August 10, 2022 | Complaint | Partial | Safety | 5 | $29,584 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| March 14, 2022 | 1926.652(a)(1) | Requirements for protective systems | Serious | 10 | July 21, 2022 | $10,151 | $6,091 | osha.gov |
| March 14, 2022 | 1926.651(e) | Specific excavation requirements | Serious | 10 | July 21, 2022 | $10,151 | $6,091 | osha.gov |
| March 14, 2022 | 1926.651(c)(2) | Specific excavation requirements | Serious | 10 | July 21, 2022 | $10,151 | $6,091 | osha.gov |
| March 14, 2022 | 1926.100(a) | Head protection | Serious | 5 | July 21, 2022 | $8,702 | $5,221 | osha.gov |
| March 14, 2022 | OSH Act section 5(a)(1) | General duty clause | Serious | 10 | July 21, 2022 | $10,151 | $6,091 | osha.gov |
Also on SpecStream
- All OSHA citations in Other Heavy and Civil Engineering Construction in Texas
- OSHA citations in Texas
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.100, Head protection: all citations
- 29 CFR 1926.652, Requirements for protective systems: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.