Data / Workplace safety / Maryland / Joseph K. Eades II
Joseph K. Eades II, Chaptico, MD: 7 OSHA citations, $9,250 in penalties (2022)
OSHA recorded 1 inspection at Joseph K. Eades II, 24311 River Drive, Chaptico, MD 20621, on August 10, 2022. 1 inspection ended in citations: 7 citations with $9,250 in initial penalties and $9,250 in current penalties. The latest citation was issued February 7, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 24311 River Drive, Chaptico, MD 20621
- Industry
- 238350 Finish Carpentry Contractors
- Ownership
- Private
- Employees at the site
- 3 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 7
- Penalties
- $9,250 initial, $9,250 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| August 10, 2022 | Fatality or catastrophe | Complete | Safety | 7 | $9,250 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| August 10, 2022 | 1926.416(e)(1) | General requirements | Serious | 7 | February 7, 2023 | $1,050 | $1,050 | osha.gov |
| August 10, 2022 | 1926.405(g)(2)(iv) | Wiring methods, components, and equipment for general use | Serious | 7 | February 7, 2023 | $1,050 | $1,050 | osha.gov |
| August 10, 2022 | 1926.404(f)(6) | Wiring design and protection | Serious | 7 | February 7, 2023 | $3,050 | $3,050 | osha.gov |
| August 10, 2022 | 1926.404(b)(1)(i) | Wiring design and protection | Serious | 7 | February 7, 2023 | $3,050 | $3,050 | osha.gov |
| August 10, 2022 | 1926.21(b)(2) | Safety training and education | Serious | 7 | February 7, 2023 | $0 | $0 | osha.gov |
| August 10, 2022 | 1926.20(b)(2) | General safety and health provisions | Serious | 7 | February 7, 2023 | $0 | $0 | osha.gov |
| August 10, 2022 | 1926.20(b)(1) | General safety and health provisions | Serious | 7 | February 7, 2023 | $1,050 | $1,050 | osha.gov |
Also on SpecStream
- All OSHA citations in Building Finishing Contractors in Maryland
- OSHA citations in Maryland
- 29 CFR 1926.20, General safety and health provisions: all citations
- 29 CFR 1926.404, Wiring design and protection: all citations
- 29 CFR 1926.21, Safety training and education: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.