Data / Workplace safety / Virginia / Jones Road and Bridge
Jones Road and Bridge, Riner, VA: 10 OSHA citations, $35,210 in penalties (2023)
OSHA recorded 1 inspection at Jones Road and Bridge, 4031 Riner Road, Riner, VA 24149, on April 18, 2023. 1 inspection ended in citations: 10 citations with $35,210 in initial penalties and $35,210 in current penalties. The latest citation was issued May 8, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 4031 Riner Road, Riner, VA 24149
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 7 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 10
- Penalties
- $35,210 initial, $35,210 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| April 18, 2023 | June 30, 2023 | Planned | Partial | Safety | 10 | $35,210 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| April 18, 2023 | 1926.651(k)(2) | Specific excavation requirements | Other than serious | 1 | May 8, 2023 | $0 | $0 | osha.gov |
| April 18, 2023 | 1926.651(k)(1) | Specific excavation requirements | Other than serious | 1 | May 8, 2023 | $0 | $0 | osha.gov |
| April 18, 2023 | 1926.50(c) | Medical services and first aid | Other than serious | 1 | May 8, 2023 | $0 | $0 | osha.gov |
| April 18, 2023 | 1926.701(b) | General requirements | Other than serious | 5 | May 8, 2023 | $6,030 | $6,030 | osha.gov |
| April 18, 2023 | 1926.652(a)(1) | Requirements for protective systems | Serious | 10 | May 8, 2023 | $8,560 | $8,560 | osha.gov |
| April 18, 2023 | 1926.651(j)(2) | Specific excavation requirements | Serious | 5 | May 8, 2023 | $0 | $0 | osha.gov |
| April 18, 2023 | 1926.651(j)(1) | Specific excavation requirements | Serious | 5 | May 8, 2023 | $6,030 | $6,030 | osha.gov |
| April 18, 2023 | 1926.651(i)(3) | Specific excavation requirements | Serious | 10 | May 8, 2023 | $0 | $0 | osha.gov |
| April 18, 2023 | 1926.651(i)(1) | Specific excavation requirements | Serious | 10 | May 8, 2023 | $8,560 | $8,560 | osha.gov |
| April 18, 2023 | 1926.651(c)(2) | Specific excavation requirements | Other than serious | 5 | May 8, 2023 | $6,030 | $6,030 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Virginia
- OSHA citations in Virginia
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.652, Requirements for protective systems: all citations
- 29 CFR 1926.701, General requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.