Data / Workplace safety / Florida / J&L Total Innovation Corp
J&L Total Innovation Corp, Miami, FL: 5 OSHA citations, $6,216 in penalties (2022)
OSHA recorded 1 inspection at J&L Total Innovation Corp, 6955 NW 52ND Street, Miami, FL 33166, on June 3, 2022. 1 inspection ended in citations: 5 citations with $12,432 in initial penalties and $6,216 in current penalties. The latest citation was issued November 25, 2022.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 6955 NW 52ND Street, Miami, FL 33166
- Industry
- 238310 Drywall and Insulation Contractors
- Ownership
- Private
- Employees at the site
- 3 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 5
- Penalties
- $12,432 initial, $6,216 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| June 3, 2022 | July 6, 2023 | Referral | Partial | Safety | 5 | $6,216 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| June 3, 2022 | 1926.454(a)(1) | Training requirements | Serious | 5 | November 25, 2022 | $0 | $0 | osha.gov |
| June 3, 2022 | 1926.452(w)(2) | Additional requirements applicable to specific types of scaffolds | Serious | 5 | November 25, 2022 | $3,108 | $1,554 | osha.gov |
| June 3, 2022 | 1926.451(f)(3) | General requirements | Serious | 5 | November 25, 2022 | $3,108 | $1,554 | osha.gov |
| June 3, 2022 | 1926.451(g)(1)(vii) | General requirements | Serious | 5 | November 25, 2022 | $3,108 | $1,554 | osha.gov |
| June 3, 2022 | 1926.451(f)(7) | General requirements | Serious | 5 | November 25, 2022 | $3,108 | $1,554 | osha.gov |
Also on SpecStream
- All OSHA citations in Building Finishing Contractors in Florida
- OSHA citations in Florida
- 29 CFR 1926.451, General requirements: all citations
- 29 CFR 1926.452, Additional requirements applicable to specific types of scaffolds: all citations
- 29 CFR 1926.454, Training requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.