Isj Underground Utilities, LLC., Spring, TX: 5 OSHA citations, $33,440 in penalties (2023)
OSHA recorded 2 inspections at Isj Underground Utilities, LLC., 7506 Spring Cypress RD., Spring, TX 77379, between March 22, 2023 and March 29, 2023. 2 inspections ended in citations: 5 citations with $45,316 in initial penalties and $33,440 in current penalties. The latest citation was issued July 24, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 7506 Spring Cypress RD., Spring, TX 77379
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 3 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 5
- Penalties
- $45,316 initial, $33,440 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| March 29, 2023 | October 1, 2024 | Programmed other | Partial | Safety | 2 | $19,377 | osha.gov |
| March 22, 2023 | January 29, 2025 | Planned | Partial | Safety | 3 | $14,063 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| March 29, 2023 | 1926.652(a)(1) | Requirements for protective systems | Serious | 5 | July 24, 2023 | $15,627 | $15,627 | osha.gov |
| March 29, 2023 | 1926.651(c)(2) | Specific excavation requirements | Serious | 5 | July 24, 2023 | $6,250 | $3,750 | osha.gov |
| March 22, 2023 | 1926.652(c) | Requirements for protective systems | Serious | 5 | May 9, 2023 | $7,813 | $4,688 | osha.gov |
| March 22, 2023 | 1926.651(j)(2) | Specific excavation requirements | Serious | 5 | May 9, 2023 | $7,813 | $4,688 | osha.gov |
| March 22, 2023 | 1926.651(i)(1) | Specific excavation requirements | Serious | 5 | May 9, 2023 | $7,813 | $4,688 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Texas
- OSHA citations in Texas
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.652, Requirements for protective systems: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.