Data / Workplace safety / Maryland / Innovative Machine Corporation
Innovative Machine Corporation, Westminster, MD: 22 OSHA citations, $1,535 in penalties (2023)
OSHA recorded 1 inspection at Innovative Machine Corporation, 150 Airport Drive Suite 13B, Westminster, MD 21157, on June 21, 2023. 1 inspection ended in citations: 22 citations with $2,550 in initial penalties and $1,535 in current penalties. The latest citation was issued August 29, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 150 Airport Drive Suite 13B, Westminster, MD 21157
- Industry
- 332710 Machine Shops
- Ownership
- Private
- Employees at the site
- 9 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 22
- Penalties
- $2,550 initial, $1,535 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| June 21, 2023 | November 20, 2023 | Planned | Complete | Safety | 22 | $1,535 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| June 21, 2023 | 1910.1200(e)(1)(i) | Hazard communication | Other than serious | 10 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.305(g)(2)(iii) | Wiring methods, components, and equipment for general use | Other than serious | 5 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.303(g)(1)(ii) | General | Other than serious | 5 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.303(f)(2) | General | Other than serious | 5 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.303(b)(7) | General | Other than serious | 1 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.303(b)(2) | General | Other than serious | 4 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.212(b) | General requirements for all machines | Other than serious | 1 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.178(l)(6) | Powered industrial trucks | Other than serious | 10 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.178(a)(5) | Powered industrial trucks | Other than serious | 5 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.178(a)(4) | Powered industrial trucks | Other than serious | 5 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.157(e)(2) | Portable fire extinguishers | Other than serious | 4 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.37(b)(5) | Maintenance, safeguards, and operational features for exit routes | Other than serious | 4 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.1200(h)(1) | Hazard communication | Serious | 6 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.1200(g)(1) | Hazard communication | Serious | 6 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.1200(e)(1) | Hazard communication | Serious | 6 | August 29, 2023 | $450 | $315 | osha.gov |
| June 21, 2023 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Serious | 5 | August 29, 2023 | $375 | $225 | osha.gov |
| June 21, 2023 | 1910.242(b) | Hand and portable powered tools and equipment, general | Serious | 6 | August 29, 2023 | $450 | $270 | osha.gov |
| June 21, 2023 | 1910.219(e)(1)(i) | Mechanical power-transmission apparatus | Serious | 6 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.219(d)(1) | Mechanical power-transmission apparatus | Serious | 6 | August 29, 2023 | $0 | $0 | osha.gov |
| June 21, 2023 | 1910.212(a)(1) | General requirements for all machines | Serious | 7 | August 29, 2023 | $525 | $315 | osha.gov |
| June 21, 2023 | 1910.151(c) | Medical services and first aid | Serious | 5 | August 29, 2023 | $375 | $185 | osha.gov |
| June 21, 2023 | 1910.110(f)(2)(ii) | Storage and handling of liquefied petroleum gases | Serious | 5 | August 29, 2023 | $375 | $225 | osha.gov |
Also on SpecStream
- All OSHA citations in Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing in Maryland
- OSHA citations in Maryland
- 29 CFR 1910.1200, Hazard communication: all citations
- 29 CFR 1910.303, General: all citations
- 29 CFR 1910.178, Powered industrial trucks: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.