Data / Workplace safety / Texas / Hurtado Construction Company
Hurtado Construction Company, Fulshear, TX: 8 OSHA citations, $257,811 in penalties (2023)
OSHA recorded 1 inspection at Hurtado Construction Company, Near 764 Love Road, Fulshear, TX 77406, on September 16, 2023. 1 inspection ended in citations: 8 citations with $257,811 in initial penalties and $257,811 in current penalties. The latest citation was issued March 15, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- Near 764 Love Road, Fulshear, TX 77406
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 157 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 8
- Penalties
- $257,811 initial, $257,811 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| September 16, 2023 | Fatality or catastrophe | Complete | Safety | 8 | $257,811 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| September 16, 2023 | 1904.40(a) | Providing records to government representatives | Other than serious | Not listed | March 15, 2024 | $2,281 | $2,281 | osha.gov |
| September 16, 2023 | 1926.652(a)(1) | Requirements for protective systems | Willful | 10 | March 15, 2024 | $159,710 | $159,710 | osha.gov |
| September 16, 2023 | 1926.652(g)(1)(iii) | Requirements for protective systems | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
| September 16, 2023 | 1926.652(g)(1)(ii) | Requirements for protective systems | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
| September 16, 2023 | 1926.652(c)(2)(iii) | Requirements for protective systems | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
| September 16, 2023 | 1926.651(h)(1) | Specific excavation requirements | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
| September 16, 2023 | 1926.651(c)(2) | Specific excavation requirements | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
| September 16, 2023 | 1926.50(c) | Medical services and first aid | Serious | 10 | March 15, 2024 | $15,970 | $15,970 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Texas
- OSHA citations in Texas
- 29 CFR 1926.652, Requirements for protective systems: all citations
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.50, Medical services and first aid: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.