Harloff Manufacturing Company LLC, Paw Paw, MI: 22 OSHA citations, $19,700 in penalties (2023 to 2026)
OSHA recorded 5 inspections at Harloff Manufacturing Company LLC, 828 Duo Tang RD, Paw Paw, MI 49079, between March 8, 2023 and September 2, 2026. 3 inspections ended in citations: 22 citations with $39,400 in initial penalties and $19,700 in current penalties. The latest citation was issued February 22, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 828 Duo Tang RD, Paw Paw, MI 49079
- Industry
- 332114 Custom Roll Forming
- Ownership
- Private
- Employees at the site
- 40 (as recorded at the latest inspection)
- Inspections
- 5, of which 3 with citations
- Citations
- 22
- Penalties
- $39,400 initial, $19,700 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| September 2, 2026 | Complaint | Partial | Safety | 0 | Not listed | osha.gov | |
| June 3, 2026 | Complaint | Partial | Health | 0 | Not listed | osha.gov | |
| February 5, 2024 | March 25, 2024 | Complaint | Partial | Safety | 1 | $0 | osha.gov |
| March 8, 2023 | August 3, 2023 | Unprogrammed related | Partial | Safety | 14 | $12,950 | osha.gov |
| March 8, 2023 | August 3, 2023 | Complaint | Partial | Safety | 7 | $6,750 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| February 5, 2024 | 408.12154(1) | Other than serious | Not listed | February 22, 2024 | $0 | $0 | osha.gov | |
| March 8, 2023 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | May 11, 2023 | $0 | $0 | osha.gov |
| March 8, 2023 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Serious | 5 | May 11, 2023 | $2,000 | $1,000 | osha.gov |
| March 8, 2023 | 408.12645(1) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov | |
| March 8, 2023 | 408.12477(1) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov | |
| March 8, 2023 | 408.12474 | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov | |
| March 8, 2023 | 408.12462(1) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov | |
| March 8, 2023 | 408.12461(1) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov | |
| March 8, 2023 | 408.12412(1) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov | |
| March 8, 2023 | 408.12411(2) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov | |
| March 8, 2023 | 408.12411(1) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov | |
| March 8, 2023 | 408.10721(3) | Serious | 5 | May 11, 2023 | $2,400 | $1,200 | osha.gov | |
| March 8, 2023 | 408.10727(1) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov | |
| March 8, 2023 | 408.10711 | Serious | 5 | May 11, 2023 | $2,400 | $1,200 | osha.gov | |
| March 8, 2023 | 1910.22(a)(3) | General requirements | Serious | 5 | May 11, 2023 | $1,600 | $800 | osha.gov |
| March 8, 2023 | 1910.147(c)(7)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov |
| March 8, 2023 | 1910.147(c)(5)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov |
| March 8, 2023 | 1910.147(c)(5)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov |
| March 8, 2023 | 1910.147(d)(6) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov |
| March 8, 2023 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $0 | $0 | osha.gov |
| March 8, 2023 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | May 11, 2023 | $3,500 | $1,750 | osha.gov |
| March 8, 2023 | 1910.22(a)(2) | General requirements | Serious | 5 | May 11, 2023 | $3,000 | $1,500 | osha.gov |
Also on SpecStream
- All OSHA citations in Forging and Stamping in Michigan
- OSHA citations in Michigan
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.22, General requirements: all citations
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.