Data / Workplace safety / Wisconsin / Gto Stucco & Designs, LLC
Gto Stucco & Designs, LLC, Bayside, WI: 7 OSHA citations, $12,706 in penalties (2023)
OSHA recorded 2 inspections at Gto Stucco & Designs, LLC, 8989 North Port Washington Road, Bayside, WI 53217, between October 4, 2023 and October 17, 2023. 2 inspections ended in citations: 7 citations with $16,536 in initial penalties and $12,706 in current penalties. The latest citation was issued June 4, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 8989 North Port Washington Road, Bayside, WI 53217
- Industry
- 238320 Painting and Wall Covering Contractors
- Ownership
- Private
- Employees at the site
- 10 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 7
- Penalties
- $16,536 initial, $12,706 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| October 17, 2023 | Planned | Partial | Safety | 4 | $9,376 | osha.gov | |
| October 4, 2023 | July 31, 2024 | Programmed other | Partial | Safety | 3 | $3,330 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| October 4, 2023 | 1903.19(c)(1) | Abatement verification | Other than serious | Not listed | June 4, 2024 | $330 | $330 | osha.gov |
| October 17, 2023 | 1910.1200(e)(1) | Hazard communication | Other than serious | Not listed | December 21, 2023 | $0 | $0 | osha.gov |
| October 17, 2023 | 1926.451(g)(2) | General requirements | Serious | 5 | December 21, 2023 | $0 | $0 | osha.gov |
| October 17, 2023 | 1926.451(g)(1) | General requirements | Serious | 10 | December 21, 2023 | $4,688 | $4,688 | osha.gov |
| October 17, 2023 | 1926.451(b)(1)(i) | General requirements | Serious | 10 | December 21, 2023 | $4,688 | $4,688 | osha.gov |
| October 4, 2023 | 1926.451(b)(1)(i) | General requirements | Serious | 10 | December 21, 2023 | $3,984 | $1,500 | osha.gov |
| October 4, 2023 | 1926.20(b)(2) | General safety and health provisions | Serious | 5 | December 21, 2023 | $2,846 | $1,500 | osha.gov |
Also on SpecStream
- All OSHA citations in Building Finishing Contractors in Wisconsin
- OSHA citations in Wisconsin
- 29 CFR 1926.451, General requirements: all citations
- 29 CFR 1910.1200, Hazard communication: all citations
- 29 CFR 1926.20, General safety and health provisions: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.