Data / Workplace safety / New Jersey / Gloucester City DPW
Gloucester City DPW, Gloucester City, NJ: 7 OSHA citations, $25,900 in penalties (2025 to 2026)
OSHA recorded 2 inspections at Gloucester City DPW, 615 Brick Street, Gloucester City, NJ 08030, between November 7, 2025 and January 12, 2026. 1 inspection ended in citations: 7 citations with $25,900 in initial penalties and $25,900 in current penalties. The latest citation was issued November 20, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 615 Brick Street, Gloucester City, NJ 08030
- Industry
- 237310 Highway, Street, and Bridge Construction
- Ownership
- Local government
- Employees at the site
- 18 (as recorded at the latest inspection)
- Inspections
- 2, of which 1 with citations
- Citations
- 7
- Penalties
- $25,900 initial, $25,900 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| January 12, 2026 | January 12, 2026 | Follow-up | Partial | Safety | 0 | Not listed | osha.gov |
| November 7, 2025 | January 12, 2026 | Planned | Complete | Safety | 7 | $25,900 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| November 7, 2025 | N.J.A.C. 12:100-7.3(A) | Other than serious | 5 | November 20, 2025 | $700 | $700 | osha.gov | |
| November 7, 2025 | 1910.132(d)(2) | General requirements | Other than serious | 5 | November 20, 2025 | $700 | $700 | osha.gov |
| November 7, 2025 | N.J.S.A. 34:6A-33(A) | Serious | 10 | November 20, 2025 | $4,900 | $4,900 | osha.gov | |
| November 7, 2025 | 1910.305(b)(1)(ii) | Wiring methods, components, and equipment for general use | Serious | 10 | November 20, 2025 | $4,900 | $4,900 | osha.gov |
| November 7, 2025 | 1910.215(a)(4) | Abrasive wheel machinery | Serious | 10 | November 20, 2025 | $4,900 | $4,900 | osha.gov |
| November 7, 2025 | 1910.147(c)(1) | The control of hazardous energy (lockout/tagout) | Serious | 10 | November 20, 2025 | $4,900 | $4,900 | osha.gov |
| November 7, 2025 | 1910.22(a)(1) | General requirements | Serious | 10 | November 20, 2025 | $4,900 | $4,900 | osha.gov |
Also on SpecStream
- All OSHA citations in Highway, Street, and Bridge Construction in New Jersey
- OSHA citations in New Jersey
- 29 CFR 1910.22, General requirements: all citations
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.215, Abrasive wheel machinery: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.