Skip to the page

Data / Workplace safety / Tennessee / Dyer Royce Manufacturing, LLC

Dyer Royce Manufacturing, LLC, Dandridge, TN: 27 OSHA citations, $11,525 in penalties (2023)

OSHA recorded 2 inspections at Dyer Royce Manufacturing, LLC, 2866 Beecarter RD, Dandridge, TN 37725, between June 6, 2023 and July 11, 2023. 2 inspections ended in citations: 27 citations with $14,500 in initial penalties and $11,525 in current penalties. The latest citation was issued October 26, 2023.

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

Site
2866 Beecarter RD, Dandridge, TN 37725
Industry
337121 Upholstered Household Furniture Manufacturing
Ownership
Private
Employees at the site
11 (as recorded at the latest inspection)
Inspections
2, of which 2 with citations
Citations
27
Penalties
$14,500 initial, $11,525 current

Inspections

Every inspection OSHA opened at this site since November 3, 2021.

OpenedClosedTypeScopeFocusCitationsCurrent penaltiesSource
July 11, 2023February 26, 2024ReferralPartialSafety18$9,125osha.gov
June 6, 2023June 20, 2024PlannedCompleteHealth9$2,400osha.gov

Citations

One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.

Inspection openedStandard citedStandard titleTypeGravityIssuedInitial penaltyCurrent penaltySource
June 6, 20231910.157(e)(3)Portable fire extinguishersOther than serious10October 26, 2023$0$0osha.gov
June 6, 20231910.151(b)Medical services and first aidOther than serious10October 26, 2023$0$0osha.gov
June 6, 20231910.1200(h)(1)Hazard communicationSerious5October 26, 2023$0$0osha.gov
June 6, 20231910.1200(f)(6)(ii)Hazard communicationSerious5October 26, 2023$0$0osha.gov
June 6, 20231910.1200(e)(1)Hazard communicationSerious5October 26, 2023$600$600osha.gov
June 6, 20231910.151(c)Medical services and first aidSerious5October 26, 2023$600$600osha.gov
June 6, 20231910.133(a)(1)Eye and face protectionSerious5October 26, 2023$600$600osha.gov
June 6, 20231910.134(c)(2)(ii)Respiratory protectionSerious5October 26, 2023$0$0osha.gov
June 6, 20231910.134(c)(2)(i)Respiratory protectionSerious5October 26, 2023$600$600osha.gov
July 11, 20231910.303(g)(1)(ii)GeneralOther than serious1September 18, 2023$100$100osha.gov
July 11, 20231910.303(b)(2)GeneralOther than serious1September 18, 2023$100$100osha.gov
July 11, 20231910.219(e)(3)(i)Mechanical power-transmission apparatusSerious4September 18, 2023$0$0osha.gov
July 11, 20231910.219(d)(1)Mechanical power-transmission apparatusSerious4September 18, 2023$500$375osha.gov
July 11, 20231910.215(b)(9)Abrasive wheel machinerySerious4September 18, 2023$500$375osha.gov
July 11, 20231910.215(a)(4)Abrasive wheel machinerySerious4September 18, 2023$500$375osha.gov
July 11, 20231910.215(a)(2)Abrasive wheel machinerySerious4September 18, 2023$500$375osha.gov
July 11, 20231910.213(m)(1)Woodworking machinery requirementsSerious6September 18, 2023$700$525osha.gov
July 11, 20231910.213(l)(2)Woodworking machinery requirementsSerious5September 18, 2023$600$450osha.gov
July 11, 20231910.212(b)General requirements for all machinesSerious4September 18, 2023$500$375osha.gov
July 11, 20231910.212(a)(1)General requirements for all machinesSerious6September 18, 2023$700$525osha.gov
July 11, 20231910.178(l)(1)(i)Powered industrial trucksSerious6September 18, 2023$700$525osha.gov
July 11, 20231910.147(c)(1)The control of hazardous energy (lockout/tagout)Serious8September 18, 2023$4,000$3,000osha.gov
July 11, 20231910.107(g)(2)Spray finishing using flammable and combustible materialsSerious5September 18, 2023$600$450osha.gov
July 11, 20231910.107(e)(9)Spray finishing using flammable and combustible materialsSerious5September 18, 2023$0$0osha.gov
July 11, 20231910.107(e)(5)Spray finishing using flammable and combustible materialsSerious6September 18, 2023$700$525osha.gov
July 11, 20231910.107(e)(2)Spray finishing using flammable and combustible materialsSerious6September 18, 2023$700$525osha.gov
July 11, 20231910.107(b)(5)(iv)Spray finishing using flammable and combustible materialsSerious6September 18, 2023$700$525osha.gov

Also on SpecStream

Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.