Data / Workplace safety / Florida / Derby Gold Pine Shavings Company
Derby Gold Pine Shavings Company, Williston, FL: 35 OSHA citations, $124,942 in penalties (2023 to 2024)
OSHA recorded 2 inspections at Derby Gold Pine Shavings Company, 20510 East Levy Street, Williston, FL 32696, between May 9, 2023 and September 28, 2024. 2 inspections ended in citations: 35 citations with $190,954 in initial penalties and $124,942 in current penalties. The latest citation was issued March 26, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 20510 East Levy Street, Williston, FL 32696
- Industry
- 321113 Sawmills
- Ownership
- Private
- Employees at the site
- 20 (as recorded at the latest inspection)
- Inspections
- 2, of which 2 with citations
- Citations
- 35
- Penalties
- $190,954 initial, $124,942 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| September 28, 2024 | April 30, 2026 | Fatality or catastrophe | Complete | Safety | 23 | $66,012 | osha.gov |
| May 9, 2023 | September 18, 2023 | Complaint | Partial | Safety | 12 | $58,930 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| September 28, 2024 | 1910.147(c)(7)(iv) | The control of hazardous energy (lockout/tagout) | Other than serious | Not listed | March 26, 2025 | $0 | $0 | osha.gov |
| September 28, 2024 | 1910.219(f)(3) | Mechanical power-transmission apparatus | Repeat | 10 | March 26, 2025 | $14,564 | $12,380 | osha.gov |
| September 28, 2024 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 5 | March 26, 2025 | $0 | $0 | osha.gov |
| September 28, 2024 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 5 | March 26, 2025 | $6,242 | $6,242 | osha.gov |
| September 28, 2024 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Serious | 5 | March 26, 2025 | $6,242 | $0 | osha.gov |
| September 28, 2024 | 1910.305(b)(1)(i) | Wiring methods, components, and equipment for general use | Serious | 5 | March 26, 2025 | $6,242 | $6,242 | osha.gov |
| September 28, 2024 | 1910.265(c)(18)(i) | Sawmills | Serious | 10 | March 26, 2025 | $7,282 | $1,574 | osha.gov |
| September 28, 2024 | 1910.265(c)(4)(iv) | Sawmills | Serious | 10 | March 26, 2025 | $7,282 | $1,574 | osha.gov |
| September 28, 2024 | 1910.242(b) | Hand and portable powered tools and equipment, general | Serious | 5 | March 26, 2025 | $4,161 | $1,574 | osha.gov |
| September 28, 2024 | 1910.219(d)(1) | Mechanical power-transmission apparatus | Serious | 5 | March 26, 2025 | $5,202 | $1,574 | osha.gov |
| September 28, 2024 | 1910.178(l)(1)(i) | Powered industrial trucks | Serious | 10 | March 26, 2025 | $7,282 | $1,574 | osha.gov |
| September 28, 2024 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 26, 2025 | $7,282 | $1,574 | osha.gov |
| September 28, 2024 | 1910.147(d) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 26, 2025 | $7,282 | $0 | osha.gov |
| September 28, 2024 | 1910.147(c)(5)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 26, 2025 | $5,202 | $0 | osha.gov |
| September 28, 2024 | 1910.147(c)(4)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 26, 2025 | $7,282 | $7,282 | osha.gov |
| September 28, 2024 | 1910.147(f)(3)(ii) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 26, 2025 | $0 | $0 | osha.gov |
| September 28, 2024 | 1910.147(c)(8) | The control of hazardous energy (lockout/tagout) | Serious | 5 | March 26, 2025 | $0 | $0 | osha.gov |
| September 28, 2024 | 1910.147(c)(4)(i) | The control of hazardous energy (lockout/tagout) | Serious | 10 | March 26, 2025 | $16,550 | $16,550 | osha.gov |
| September 28, 2024 | 1910.101(b) | Compressed gases (general requirements) | Serious | 5 | March 26, 2025 | $4,161 | $1,574 | osha.gov |
| September 28, 2024 | 1910.36(g)(2) | Design and construction requirements for exit routes | Serious | 5 | March 26, 2025 | $6,242 | $1,574 | osha.gov |
| September 28, 2024 | 1910.29(f)(4) | Fall protection systems and falling object protection, criteria and practices | Serious | 1 | March 26, 2025 | $3,121 | $1,574 | osha.gov |
| September 28, 2024 | 1910.22(d)(1) | General requirements | Serious | 5 | March 26, 2025 | $4,161 | $1,574 | osha.gov |
| September 28, 2024 | 1910.22(a)(3) | General requirements | Serious | 5 | March 26, 2025 | $6,242 | $1,574 | osha.gov |
| May 9, 2023 | 1904.39(a)(2) | Reporting fatalities, hospitalizations, amputations, and losses of an eye as a result of work-related incidents to OSHA | Other than serious | Not listed | August 16, 2023 | $4,465 | $4,465 | osha.gov |
| May 9, 2023 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Serious | 5 | August 16, 2023 | $4,465 | $4,465 | osha.gov |
| May 9, 2023 | 1910.303(g)(2)(i) | General | Serious | 10 | August 16, 2023 | $0 | $0 | osha.gov |
| May 9, 2023 | 1910.303(c)(3)(i) | General | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.219(f)(3) | Mechanical power-transmission apparatus | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.219(e)(1)(i) | Mechanical power-transmission apparatus | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.219(c)(2)(i) | Mechanical power-transmission apparatus | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.212(a)(1) | General requirements for all machines | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.147(c)(1) | The control of hazardous energy (lockout/tagout) | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.28(b)(6)(i) | Duty to have fall protection and falling object protection | Serious | 10 | August 16, 2023 | $0 | $0 | osha.gov |
| May 9, 2023 | 1910.28(b)(1)(i) | Duty to have fall protection and falling object protection | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
| May 9, 2023 | 1910.22(a)(2) | General requirements | Serious | 10 | August 16, 2023 | $6,250 | $6,250 | osha.gov |
Also on SpecStream
- All OSHA citations in Sawmills and Wood Preservation in Florida
- OSHA citations in Florida
- 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): all citations
- 29 CFR 1910.219, Mechanical power-transmission apparatus: all citations
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.