Skip to the page

Data / Workplace safety / Rhode Island / Denison Pharmaceuticals, LLC

Denison Pharmaceuticals, LLC, Lincoln, RI: 6 OSHA citations, $94,718 in penalties (2022 to 2023)

OSHA recorded 3 inspections at Denison Pharmaceuticals, LLC, 1 Powder Hill Road, Lincoln, RI 02865, between August 26, 2022 and August 25, 2023. 3 inspections ended in citations: 6 citations with $149,139 in initial penalties and $94,718 in current penalties. The latest citation was issued February 8, 2024.

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

Site
1 Powder Hill Road, Lincoln, RI 02865
Industry
325412 Pharmaceutical Preparation Manufacturing
Ownership
Private
Employees at the site
100 (as recorded at the latest inspection)
Inspections
3, of which 3 with citations
Citations
6
Penalties
$149,139 initial, $94,718 current

Inspections

Every inspection OSHA opened at this site since November 3, 2021.

OpenedClosedTypeScopeFocusCitationsCurrent penaltiesSource
August 25, 2023March 17, 2025ReferralPartialSafety4$80,655osha.gov
October 3, 2022August 3, 2023ReferralPartialSafety1$5,625osha.gov
August 26, 2022August 3, 2023ReferralPartialSafety1$8,438osha.gov

Citations

One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.

Inspection openedStandard citedStandard titleTypeGravityIssuedInitial penaltyCurrent penaltySource
August 25, 20231910.212(a)(1)General requirements for all machinesRepeat10February 8, 2024$80,655$64,524osha.gov
August 25, 20231910.147(c)(7)(i)The control of hazardous energy (lockout/tagout)Serious10February 8, 2024$16,131$0osha.gov
August 25, 20231910.147(c)(6)(ii)The control of hazardous energy (lockout/tagout)Serious10February 8, 2024$16,131$0osha.gov
August 25, 20231910.147(c)(4)(ii)The control of hazardous energy (lockout/tagout)Serious10February 8, 2024$16,131$16,131osha.gov
October 3, 20221910.212(a)(1)General requirements for all machinesSerious5January 24, 2023$8,036$5,625osha.gov
August 26, 20221910.212(a)(1)General requirements for all machinesOther than serious5January 24, 2023$12,055$8,438osha.gov

Also on SpecStream

Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.