Data / Workplace safety / Idaho / Dahle Construction LLC
Dahle Construction LLC, Salmon, ID: 7 OSHA citations, $26,564 in penalties (2025)
OSHA recorded 1 inspection at Dahle Construction LLC, 2 B and T Road, Salmon, ID 83467, on April 1, 2025. 1 inspection ended in citations: 7 citations with $69,515 in initial penalties and $26,564 in current penalties. The latest citation was issued September 19, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 2 B and T Road, Salmon, ID 83467
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
- Ownership
- Private
- Employees at the site
- 65 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 7
- Penalties
- $69,515 initial, $26,564 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| April 1, 2025 | October 28, 2026 | Fatality or catastrophe | Partial | Safety | 7 | $26,565 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| April 1, 2025 | 1904.39(a)(1) | Reporting fatalities, hospitalizations, amputations, and losses of an eye as a result of work-related incidents to OSHA | Other than serious | Not listed | September 19, 2025 | $9,931 | $2,483 | osha.gov |
| April 1, 2025 | 1926.652(a)(1) | Requirements for protective systems | Repeat | 5 | September 19, 2025 | $19,863 | $9,932 | osha.gov |
| April 1, 2025 | 1926.651(c)(2) | Specific excavation requirements | Repeat | 5 | September 19, 2025 | $15,888 | $3,972 | osha.gov |
| April 1, 2025 | 1926.1153(g)(1) | Respirable crystalline silica | Serious | 5 | September 19, 2025 | $0 | $0 | osha.gov |
| April 1, 2025 | 1926.1153(d)(2)(i) | Respirable crystalline silica | Serious | 5 | September 19, 2025 | $0 | $0 | osha.gov |
| April 1, 2025 | 1926.1153(c)(1) | Respirable crystalline silica | Serious | 5 | September 19, 2025 | $9,931 | $4,965 | osha.gov |
| April 1, 2025 | OSH Act section 5(a)(1) | General duty clause | Serious | 10 | September 19, 2025 | $13,902 | $5,213 | osha.gov |
Also on SpecStream
- All OSHA citations in Utility System Construction in Idaho
- OSHA citations in Idaho
- 29 CFR 1926.1153, Respirable crystalline silica: all citations
- 29 CFR 1926.651, Specific excavation requirements: all citations
- 29 CFR 1926.652, Requirements for protective systems: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.