Data / Workplace safety / South Carolina / Concrete Supply Co
Concrete Supply Co, Lexington, SC: 7 OSHA citations, $8,925 in penalties (2022)
OSHA recorded 1 inspection at Concrete Supply Co, 585 Calks Ferry Road, Lexington, SC 29072, on September 29, 2022. 1 inspection ended in citations: 7 citations with $8,925 in initial penalties and $8,925 in current penalties. The latest citation was issued March 1, 2023.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 585 Calks Ferry Road, Lexington, SC 29072
- Industry
- 327320 Ready-Mix Concrete Manufacturing
- Ownership
- Private
- Employees at the site
- 12 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 7
- Penalties
- $8,925 initial, $8,925 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| September 29, 2022 | October 21, 2025 | Planned | Complete | Health | 7 | $8,925 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| September 29, 2022 | 1910.1200(f)(6) | Hazard communication | Other than serious | Not listed | March 1, 2023 | $500 | $500 | osha.gov |
| September 29, 2022 | 1910.133(a)(1) | Eye and face protection | Other than serious | Not listed | March 1, 2023 | $0 | $0 | osha.gov |
| September 29, 2022 | 1910.132(a) | General requirements | Other than serious | Not listed | March 1, 2023 | $1,300 | $1,300 | osha.gov |
| September 29, 2022 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Other than serious | Not listed | March 1, 2023 | $1,500 | $1,500 | osha.gov |
| September 29, 2022 | 1910.303(b)(6) | General | Other than serious | Not listed | March 1, 2023 | $1,250 | $1,250 | osha.gov |
| September 29, 2022 | 1910.151(c) | Medical services and first aid | Other than serious | Not listed | March 1, 2023 | $1,750 | $1,750 | osha.gov |
| September 29, 2022 | 1910.138(a) | Hand protection | Other than serious | Not listed | March 1, 2023 | $2,625 | $2,625 | osha.gov |
Also on SpecStream
- All OSHA citations in Cement and Concrete Product Manufacturing in South Carolina
- OSHA citations in South Carolina
- 29 CFR 1910.138, Hand protection: all citations
- 29 CFR 1910.151, Medical services and first aid: all citations
- 29 CFR 1910.303, General: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.