Data / Workplace safety / Florida / Clear Span Structures, LLC
Clear Span Structures, LLC, Doral, FL: 2 OSHA citations, $6,452 in penalties (2024)
OSHA recorded 1 inspection at Clear Span Structures, LLC, Street Address 1: 10055 NW 12TH Street, Doral, FL 33172, on April 2, 2024. 1 inspection ended in citations: 2 citations with $6,452 in initial penalties and $6,452 in current penalties. The latest citation was issued September 18, 2024.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- Street Address 1: 10055 NW 12TH Street, Doral, FL 33172
- Industry
- 236220 Commercial and Institutional Building Construction
- Ownership
- Private
- Employees at the site
- 1 (as recorded at the latest inspection)
- Inspections
- 1, of which 1 with citations
- Citations
- 2
- Penalties
- $6,452 initial, $6,452 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| April 2, 2024 | April 30, 2025 | Unprogrammed related | Partial | Safety | 2 | $6,452 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| April 2, 2024 | 1926.417(b) | Lockout and tagging of circuits | Serious | 10 | September 18, 2024 | $0 | $0 | osha.gov |
| April 2, 2024 | 1926.850(c) | Preparatory operations | Serious | 10 | September 18, 2024 | $6,452 | $6,452 | osha.gov |
Also on SpecStream
- All OSHA citations in Nonresidential Building Construction in Florida
- OSHA citations in Florida
- 29 CFR 1926.850, Preparatory operations: all citations
- 29 CFR 1926.417, Lockout and tagging of circuits: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.