Skip to the page

Data / Workplace safety / Nevada / Builders Firstsource Group of Nevada LLC

Builders Firstsource Group of Nevada LLC, Reno, NV: 13 OSHA citations, $14,405 in penalties (2024)

OSHA recorded 2 inspections at Builders Firstsource Group of Nevada LLC, 3500 White Lake Parkway, Reno, NV 89508, on November 8, 2024. 2 inspections ended in citations: 13 citations with $14,405 in initial penalties and $14,405 in current penalties. The latest citation was issued April 10, 2025.

SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.

Site
3500 White Lake Parkway, Reno, NV 89508
Industry
321214 Veneer, Plywood, and Engineered Wood Product Manufacturing
Ownership
Private
Employees at the site
54 (as recorded at the latest inspection)
Inspections
2, of which 2 with citations
Citations
13
Penalties
$14,405 initial, $14,405 current

Inspections

Every inspection OSHA opened at this site since November 3, 2021.

OpenedClosedTypeScopeFocusCitationsCurrent penaltiesSource
November 8, 2024PlannedCompleteSafety8$11,917osha.gov
November 8, 2024PlannedCompleteHealth5$2,488osha.gov

Citations

One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.

Inspection openedStandard citedStandard titleTypeGravityIssuedInitial penaltyCurrent penaltySource
November 8, 20241910.334(a)(2)(ii)Use of equipmentOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.305(g)(1)(iv)Wiring methods, components, and equipment for general useOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.303(b)(7)(iv)GeneralOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.253(b)(4)(iii)Oxygen-fuel gas welding and cuttingOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.178(a)(4)Powered industrial trucksOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.178(l)(4)(iii)Powered industrial trucksOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.36(d)(1)Design and construction requirements for exit routesSerious1April 10, 2025$4,469$4,469osha.gov
November 8, 20241910.212(a)(1)General requirements for all machinesSerious5April 10, 2025$7,448$7,448osha.gov
November 8, 2024NEVADA ADMINISTRATIVE CODE 618.54Other than serious5April 10, 2025$815$815osha.gov
November 8, 20241910.242(b)Hand and portable powered tools and equipment, generalOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.134(k)(6)Respiratory protectionOther than serious1April 10, 2025$0$0osha.gov
November 8, 20241910.38(c)(2)Emergency action plansOther than serious5April 10, 2025$837$837osha.gov
November 8, 20241910.22(a)(1)General requirementsOther than serious5April 10, 2025$837$837osha.gov

Also on SpecStream

Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.