Data / Workplace safety / New Jersey / Borough of Spring Lake DPW
Borough of Spring Lake DPW, Spring Lake, NJ: 10 OSHA citations, $46,200 in penalties (2025)
OSHA recorded 2 inspections at Borough of Spring Lake DPW, 501 5TH Avenue, Spring Lake, NJ 07762, between August 5, 2025 and November 5, 2025. 1 inspection ended in citations: 10 citations with $46,200 in initial penalties and $46,200 in current penalties. The latest citation was issued August 15, 2025.
SpecStream is the live web data engine for teams and agents. It reads OSHA inspections and citations from the US Department of Labor's enforcement data, and this page is that reading. Ask for the employers you check by industry, state or standard and new inspections and citations arrive in your sheet, CRM, Slack or agent as they are posted.
- Site
- 501 5TH Avenue, Spring Lake, NJ 07762
- Industry
- 237310 Highway, Street, and Bridge Construction
- Ownership
- Local government
- Employees at the site
- 25 (as recorded at the latest inspection)
- Inspections
- 2, of which 1 with citations
- Citations
- 10
- Penalties
- $46,200 initial, $46,200 current
Inspections
Every inspection OSHA opened at this site since November 3, 2021.
| Opened | Closed | Type | Scope | Focus | Citations | Current penalties | Source |
|---|---|---|---|---|---|---|---|
| November 5, 2025 | November 5, 2025 | Follow-up | Partial | Safety | 0 | Not listed | osha.gov |
| August 5, 2025 | November 5, 2025 | Planned | Complete | Safety | 10 | $46,200 | osha.gov |
Citations
One row for each citation, newest first. Gravity is OSHA's level of gravity for serious violations.
| Inspection opened | Standard cited | Standard title | Type | Gravity | Issued | Initial penalty | Current penalty | Source |
|---|---|---|---|---|---|---|---|---|
| August 5, 2025 | 1910.334(a)(3)(i) | Use of equipment | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.305(g)(1)(iv) | Wiring methods, components, and equipment for general use | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.305(b)(2)(i) | Wiring methods, components, and equipment for general use | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.303(g)(2)(i) | General | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.215(a)(4) | Abrasive wheel machinery | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.212(a)(3)(ii) | General requirements for all machines | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.176(b) | Handling materials, general | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
| August 5, 2025 | 1910.147(c)(6)(i) | The control of hazardous energy (lockout/tagout) | Serious | 5 | August 15, 2025 | $3,500 | $3,500 | osha.gov |
| August 5, 2025 | 1910.30(a)(1) | Training requirements | Serious | 5 | August 15, 2025 | $3,500 | $3,500 | osha.gov |
| August 5, 2025 | 1910.22(a)(1) | General requirements | Serious | 10 | August 15, 2025 | $4,900 | $4,900 | osha.gov |
Also on SpecStream
- All OSHA citations in Highway, Street, and Bridge Construction in New Jersey
- OSHA citations in New Jersey
- 29 CFR 1910.305, Wiring methods, components, and equipment for general use: all citations
- 29 CFR 1910.22, General requirements: all citations
- 29 CFR 1910.30, Training requirements: all citations
Updated November 3, 2026. Read from US Department of Labor, OSHA enforcement data. Public domain (U.S. government work). Penalties are as OSHA records them on the date this page was read and can change after a contest or a settlement. Citations OSHA deleted are left out. Each row links to OSHA's own inspection record. This page uses US Department of Labor data and is not endorsed or certified by the US Department of Labor. Free to reuse with credit to SpecStream under CC BY 4.0. Spot a wrong value? Write to [email protected] with the link to this page.